Laserfiche WebLink
Hilbert, Hans <br /> From: James, Christopher <br /> Sent: Wednesday, August 24, 2016 11:08 AM <br /> To: Hilbert, Hans <br /> Cc: Close, Sarah <br /> Subject: FW: Lussier Park Boat Launch <br /> Attachments: Dane County Parks Divsion. 1-2017.Drawings.pdf <br /> Hans, <br /> See follow up below and attached from Strand, and let us know if you need anything else. <br /> Thanks! <br /> chris <br /> From: Simpson, Zach [mailto:Zach.Simoson@strand.com] <br /> Sent: Monday, August 22, 2016 9:01 AM <br /> To: James, Christopher <br /> Subject: Lussier Park Boat Launch <br /> Chris, <br /> We understand the Fish Lake base flood elevation is 869.60 and that the County wishes for Strand to certify that this <br /> elevation will not change based on improvements made within Lussier Park. We certify that the proposed grading as <br /> detailed on the attached, stamped drawings will result in a net cut volume below the base flood elevation,which will not <br /> have an effect on the base flood elevation. A summary of the excavation quantities below elevation 870.0 generated <br /> from our design software is as follows: <br /> Cut Volume= 2677 CY <br /> Fill Volume =822 CY <br /> Net=Cut of 1855 CY <br /> The design of the floating dock anchorage will be the responsibility of the manufacturer as outlined in the drawings and <br /> specifications. <br /> Please pass this email on to Hans Hilbert. <br /> Thanks! <br /> Zach Simpson, P.E. <br /> Mt <br /> Strand Associates, Inc.` <br /> STRAND 608 251.4843 ext. 1168 <br /> - _ zach.simpson(a?strand.com l www.strand.com <br /> Excellence in Engineering Since 9946. <br /> 1 <br />