Laserfiche WebLink
• <br /> • <br /> Gp 4" 4 3 - c/?4/90 <br /> CORRESPONDENCE/MEMORANDUM COUNTY OF DANE <br /> DATE: September 24 , 1990 <br /> TO: Bill Fleck <br /> Dane Co. Zoning <br /> FROM: Kevin Connors ( (-•/ <br /> County Conservationist <br /> RE : DAVE JONES <br /> Items To Be Addressed By The Erosion Control Plan <br /> - Deficient Items are Checked <br /> 1 . Cross-Sections of Road Ditches <br /> 2 . Profile Within Road Ditches <br /> 3 . Culvert Sizes <br /> 4 . Direction of Flow of Runoff <br /> 5 . Watershed Size For Each Drainage Area <br /> 6 . Design Discharge For Ditches & structural Measures <br /> 7 . Runoff Velocities <br /> 8 . Fertilizer & Seeding Rates & Recommendations <br /> * 9 . Time Schedule For Seeding <br /> �10 . Design & Location of Erosion Control Measures <br /> �11. Method By Which Lots Are To Be Developed <br /> 12 . Plan For Disturbing the Area & Re-Vegetation <br /> 13 . A Statement As To How Any Runoff Resulting From <br /> Construction Will Effect Areas Outside Of The Plat <br /> Comments/Concerns <br /> *The Erosion Control Plan as submitted calls for seeding of the drive <br /> and house area by Sept. 20 , 1990 . Since this will not be done, the <br /> owner will mulch all areas and dormant seed after Nov. 15 and top <br /> dress next spring. All riprap is currently in place. Sod may be <br /> placed at the culvert outlet to facilitate seeding establishment. <br /> K. C. <br /> yr <br /> cc: Lloyd Eagan, Watershed Mgt . Coord. <br /> Dave Jones <br />