Laserfiche WebLink
49 Mail Processing Center Aeronautical Study No. <br /> Federal Aviation Administration 2016-AGL-3304-OE <br /> Southwest Regional Office Prior Study No. <br /> Obstruction Evaluation Group 2015-AGL-16061-OE <br /> 10101 Hillwood Parkway <br /> Fort Worth,TX 76177 <br /> Issued Date: 04/01/2016 <br /> Chad Schakelman <br /> J.P. Cullen&Sons, Inc. <br /> 330 East Delavan Drive <br /> Janesville, WI 53547-1957 <br /> **DETERMINATION OF NO HAZARD TO AIR NAVIGATION FOR TEMPORARY STRUCTURE** <br /> The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., <br /> Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77,concerning: <br /> Structure: Crane Link Belt 2218 <br /> Location: Madison,WI <br /> Latitude: 43-05-15.07N NAD 83 <br /> Longitude: 89-21-39.48W <br /> Heights: 855 feet site elevation (SE) <br /> 240 feet above ground level(AGL) <br /> 1095 feet above mean sea level(AMSL) <br /> This aeronautical study revealed that the temporary structure does exceed obstruction standards but would not <br /> be a hazard to air navigation provided the following condition(s), if any,is(are)met: <br /> As a condition to this Determination,the structure is marked/lighted in accordance with FAA Advisory circular <br /> 70/7460-1 L,Obstruction Marking and Lighting,flags/red lights-Chapters 3(Marked),4,5(Red),&12. <br /> See attachment for additional condition(s)or information. <br /> As a condition to this determination,the temporary structure must be lowered to the ground when not in use and <br /> during the hours between sunset and sunrise. <br /> It is required that the FAA be notified 3 business days prior to the temporary structure being erected and again <br /> when the structure is removed from the site. Notification should be made to this office through your registered <br /> e-filing account. Notification is necessary so that aeronautical procedures can be temporarily modified to <br /> accommodate the structure. <br /> NOTIFICATION IS REQUIRED AGAIN THROUGH YOUR REGISTERED E-FILING ACCOUNT <br /> WHEN THE TEMPORARY STRUCTURE IS REMOVED FROM THE SITE FOR NOTICE TO <br /> AIRMAN (NOTAM)CANCELLATION. <br /> It is required that the manager of DANE COUNTY RGNL-TRUAX FIELD, (608)246-3380 be notified at least <br /> 3 business days prior to the temporary structure being erected and again when the structure is removed from the <br /> site. <br /> Page 1 of 6 <br />