|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00522
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2016 1:40:23 PM
Creation date
9/1/2016 4:27:24 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00522
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Erosion Control Permit For Office Use Only <br /> Simplified Application Checklist Permit Number: <br /> Date: <br /> Project Name: Hanson Aq Building <br /> Plan Requirements X Location of Information: <br /> Page Number or Attachment <br /> 1. Narrative describing the proposed project Construction of new Agricultural Building and <br /> include improvment to field road. Field rd is <br /> approx 1800 feet in length. 3200 sf for the <br /> building. <br /> 2. * Site plan(of known scale that includes:property lines,disturbed area limits, Attached site plan <br /> impervious area limits(existing and proposed), natural and artificial water <br /> features, 100-yr flood plain,delineated wetland boundaries,location of all V <br /> proposed erosion control practices) <br /> NOTE: Grading within 5'of the property line requires department approval <br /> 3. * Contours(existing and proposed) Attached existing contour map <br /> 4. * Watershed size for each drainage area Not required <br /> (include area draining to the site and within project boundaries) V( <br /> 5. Tracking control Impervious areas will be more than 1000' from any <br /> (provisions to prevent mud-tracking onto public streets and roads during public roadway. <br /> construction,e.g.tracking pad or existing gravel drive) <br /> 6. Sediment control practices to protect stormwater facilities or Agricultural building will be constructed in the <br /> storm sewer inlets,existing and proposed,on or adjacent to the ✓ center of current CRP grasslands. No curb and <br /> site(e.g. inlet protection or stone weeper) gutter. <br /> 7. Proposed erosion control practices Erosion control practice will include planting of <br /> (list of erosion control practices) grasses as early as ground is leveled. Project <br /> will be stabilized within a couple of weeks after <br /> It dist. Native grasses are downhill of driveway. <br /> No stockpiling is expected. <br /> 8. Proposed start date Proposed start date of erosion control practice <br /> (date for installation of all erosion control practices and start of land disturbing /is 8/15/16. <br /> activity) <br /> 9. Proposed stabilization date Proposed stabilization date is 10/01/16 <br /> (date for placement of seed&mulch,sod or permanent surfacing) ✓ <br /> 10. Culvert sizes na <br /> (existing and proposed culverts on or adjacent to the site) <br /> 11. Any other information necessary to reasonably determine the None <br /> location, nature and condition of any physical or environmental 1,/ <br /> features of the site <br /> Note: Any proposed changes to the erosion control plan must be submitted and approved prior to <br /> implementation. The permit will expire on the stabilization date indicated in the plan (see checklist item#9). <br /> * The following Dane County websites may be useful in addressing the above checklist items: <br /> http://accessdane.co.dane.wi.us/html/public.asp <br /> https://dcimapapps.countvofdane.com/Iwrviewer/ <br /> https://wred-lwrd.countyofdane.com/ <br /> Revised 03.21.2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.