|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00562
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 1:51:53 PM
Creation date
9/2/2016 1:51:51 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00562
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4SY°r.d\'), <br /> �► ��'• Dane County Planning & Development <br /> t, ids <br /> Zoning Division <br /> , f <br /> ZONING PERMIT INSPECTION REQUIREMENTS <br /> The Dane County Zoning Ordinance provides that two inspections shall be made by the Zoning Division. <br /> Instructions are as follows: <br /> 1. The permit card shall be posted on the premises before any earth disturbing activity is started. <br /> 2. The owner or agent shall have all lot corners visibly staked prior to requesting an inspection.The Zoning <br /> Inspector shall not be responsible for determining the location of lot lines. Please be advised that zoning <br /> v <br /> 1S-di liance upon your correct identification of property boundaries and lot lines. <br /> 3. FIRST INSPECTION: <br /> a. Is a location survey--quired? No <br /> If yes,a first inspec on phone call request is no -quired. Please arrange to have a copy of the survey <br /> delivered to our de• ment prior to -• s ruction above the foundation. <br /> b. If no,the owner or agent shall request the first inspection when the foundation or basement walls have <br /> been constructed. Footings only are not considered a foundation. The locational extent of the permitted structure <br /> must be identifiable at the time of the first inspection. Construction may continue only after an inspection has been <br /> re• . <br /> 4. SECOND INSPECTION: Shall be requested when the building is substantially completed. Interior trim, <br /> carpeting, painting, etc., do not have to be fi '-hed prior to the inspection but, interior walls must be in place and <br /> - -I •lumbin• and -- '•• -- es must be installed and operating. <br /> 5. CERTIFICATE OF COMPLIANCE: The zoning inspections are made to verify compliance with the regulations <br /> of the zoning ordinance. The Zoning Division, upon completion of both inspections will issue a certificate of <br /> compliance. <br /> To schedule an inspection, call 266-4266, Monday through Friday, 8:00 AM -4:00 PM. You will be given an <br /> inspection request number,which will serve as a verification of your call. <br /> Permit Number DCPZP-2016-00562 <br /> IMPORTANT: The two inspections required by the Zoning Ordinance can only be made by the Zoning Department. <br /> **TOWN PERMITS: For information regarding Town permits, contact TOWN OF BLOOMING GROVE <br /> the <br /> Town <br /> e C h E. lek- at 5-26 - 6 3�c <br /> Building Inspector/Clerk Phone Number <br /> 210 Martin Luther King Jr.Blvd. City-County Bldg,Room 116 0 Madison,WI 53703-3342 0 Phone:608.266.4266 0 Fax:608.267.1540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.