Laserfiche WebLink
MENARDS <br /> ' atialliellinta --- ---- ..--z--„-_.________,, ___ , _ <br /> IIIIJIHffF <br /> 41/2.�l II <br /> � �� <br /> E-Z BUILD SHED <br /> 1 . GENERAL <br /> Prior to beginning construction, the area selected for the shed location must be <br /> leveled and cleared of obstruction. <br /> 2. INVENTORY <br /> Separate all lumber, hardware, etc. into �$' <br /> individual stacks of like items. <br /> ��y•:V F�rty <br /> 3. FRAME PREPARATION �@Too�.�T FOLD D <br /> I,^Z L oc►T sort <br /> Unfold each frame, setting aside two frames 1mE., Fa."° <br /> EM Bi0. <br /> to be used as end walls. From 1 x 4 Pine T <br /> Boards, cut Gusset Plates 6" long. 20 for a 10' ( IFat.*`°" o <br /> Fa°Mf MEMecR (`( <br /> building, or 28 for a 14' building. Apply Gusset QE°TED2 .yam BTM. <br /> Plates on each side of the top and bottom fold �FR°.nE MEM,ER <br /> locations. Frames to be used as end walls rv4'xL'L° <br /> GuSSET Pu.1-c G8rwt <br /> require only one Gusset Plate at top and <br /> bottom on the side opposite of the metal ,.,z.. v y= V V <br /> plates. Use four 8d nails on each Gusset -1,'<— lo. o° >� <br /> Plate. See Figure 1. <br /> EZ ?7>U ILD SHED F-0.0ME <br /> FIGURE I. r <br />