|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02355
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 8:34:47 AM
Creation date
9/6/2016 10:44:16 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02355
Town
Pleasant Springs Township
Section Numbers
27
AccelaLink
DCPCUP-2016-02355
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ELL <br /> Quality Saves Money <br /> The location of the proposed 125' monopole(extendable to 160')plus a 4.5' lightning rod is in the northwest <br /> corner of the above referenced parcel within an 100'x 100' lease area as depicted in the enclosed survey and <br /> construction drawings. <br /> 3.The location of the proposed mobile service facility. <br /> SE intersection of Cty.B and Spring Road, Stoughton,WI 5355.Parcel ID#046/0611-271-8730-0 <br /> CST proposes to construct a 125' monopole(extendable to 160')plus a 4.5' lightning rod for use by Verizon <br /> Wireless Personal Communications LP d/b/a Verizon Wireless in the northwest corner of the property.This <br /> new tower structure will be located within a 100'x 100' lease area as depicted in the enclosed survey and <br /> construction drawings. Verizon Wireless will locate its antennas and equipment upon the tower at the 120' <br /> centerline,route its coax/cabling through the interior of the tower,install equipment cabinets on a raised <br /> platform and an exterior generator on concrete pad near the base of the tower structure all within the CST lease <br /> area.The monopole tower and compound is designed to accommodate at least three(3)additional wireless <br /> telecommunications equipment installations. <br /> 4.If the application is to substantially modify an existing support structure... <br /> The application is for a new monopole therefore the submittal requirements of this section are not applicable. <br /> 5.If the application is to construct a new mobile service support structure,a construction plan which <br /> describes the proposed mobile services support structure and the equipment and network components, <br /> including antennas,transmitters,receivers,base stations,power supplies,cabling,and related <br /> equipment to be placed on or around the new mobile service support structure. <br /> See the enclosed construction drawings depicting the proposed CST and Verizon Wireless installations <br /> containing the above described information. <br /> 6.If the application is to construct a new mobile service support structure,an explanation as to why the <br /> application chose the proposed location and why the applicant did not choose collocation,including a <br /> sworn statement from an individual who has the responsibility over the placement of the mobile service <br /> support structure attesting that collocation within the applicant's search ring would not result in the <br /> same mobile service functionality,coverage,and capacity; is technically infeasible;or is economically <br /> burdensome to the mobile service provider. <br /> Within the Verizon Wireless search ring as depicted in the enclosed Delorme Map there are no existing <br /> structures of any kind available for collocation by Verizon Wireless. Enclosed in the application materials is a <br /> sworn statement from the Verizon Wireless Radio Frequency Engineer assigned to the site attesting to the fact <br /> that collocation is not feasible option for this site,as there are no existing structures of any kind which exist <br /> within the Verizon Wireless Search Area that could be utilized by Verizon Wireless for a collocation. <br /> ADDITIONAL DISCUSSION <br /> This is a joint application for a proposed new communications tower facility which will be owned by Central <br /> States Tower III,LLC("CST"),a national owner and operator of wireless communications infrastructure;and <br /> an antenna and equipment installation upon this new communications tower facility by its proposed tenant, <br /> Verizon Wireless.It is not uncommon for wireless telecommunications service providers to engage the <br /> services of a tower company to construct,own,and operate the infrastructure upon which they desire locate <br /> PO Box 578790 Chicago, IL 60657 tel: (773)919-5112/fax.(866)684-3535 <br />
The URL can be used to link to this page
Your browser does not support the video tag.