Laserfiche WebLink
ELL <br /> Quality Saves Money <br /> The location of the proposed 155' tall monopole(extendable to 190')plus 4.5' lightning rod is in the northwest <br /> corner of the above referenced parcel within an 100' x 100' lease area as depicted in the enclosed survey and <br /> construction drawings. <br /> 3.The location of the proposed mobile service facility. <br /> NE intersection of Hwy. 51 and Pleasant Hill Road, Stoughton,WI 53589. Parcel ID#026/0511-023-9001-1 <br /> CST proposes to construct a 155' tall monopole(extendable to 190')plus 4.5' lightning rod for use by Verizon <br /> Wireless Personal Communications LP d/b/a Verizon Wireless in the northwest corner of the property.This <br /> new tower structure will be located within a 100' x 100' lease area as depicted in the enclosed survey and <br /> construction drawings. Verizon Wireless will locate its antennas and equipment upon the tower at the 150' <br /> centerline,route its coax/cabling through the interior of the tower,install equipment cabinets on a raised <br /> platform and an exterior generator on concrete pad near the base of the tower structure all within the CST lease <br /> area. The monopole tower and compound is designed to accommodate at least three(3)additional wireless <br /> telecommunications equipment installations. <br /> 4.If the application is to substantially modify an existing support structure... <br /> The application is for a new monopole therefore the submittal requirements of this section are not applicable. <br /> 5.If the application is to construct a new mobile service support structure,a construction plan which <br /> describes the proposed mobile services support structure and the equipment and network components, <br /> including antennas,transmitters,receivers,base stations,power supplies,cabling,and related <br /> equipment to be placed on or around the new mobile service support structure. <br /> See the enclosed construction drawings depicting the proposed CST and Verizon Wireless installations <br /> containing the above described information. <br /> 6.If the application is to construct a new mobile service support structure,an explanation as to why the <br /> application chose the proposed location and why the applicant did not choose collocation,including a <br /> sworn statement from an individual who has the responsibility over the placement of the mobile service <br /> support structure attesting that collocation within the applicant's search ring would not result in the <br /> same mobile service functionality,coverage,and capacity; is technically infeasible; or is economically <br /> burdensome to the mobile service provider. <br /> Within the Verizon Wireless search ring as depicted in the enclosed Delorme Map there are no existing <br /> structures of any kind available for collocation by Verizon Wireless. Enclosed in the application materials is a <br /> sworn statement from the Verizon Wireless Radio Frequency Engineer assigned to the site attesting to the fact <br /> that collocation is not feasible option for this site,as there are no existing structures of any kind which exist <br /> within the Verizon Wireless Search Area that could be utilized by Verizon Wireless for a collocation. <br /> ADDITIONAL DISCUSSION <br /> This is a joint application for a proposed new communications tower facility which will be owned by Central <br /> States Tower III,LLC("CST"),a national owner and operator of wireless communications infrastructure; and <br /> an antenna and equipment installation upon this new communications tower facility by its proposed tenant, <br /> Verizon Wireless. It is not uncommon for wireless telecommunications service providers to engage the <br /> services of a tower company to construct,own,and operate the infrastructure upon which they desire locate <br />