Laserfiche WebLink
ly°� 1,NINrr� Dane County Zoning Division <br /> r O. q City-County Building <br /> ,' `i �" �q� r� 210 Martin Luther King,Jr., Blvd. Room 116 <br /> , I 4 g,J <br /> err ;;MF1,.1 Madison Wisconsin 53703 <br /> x (608) 266-4266/266-9083 Fax (608) 267-1540 <br /> �I�,h\Co 14,..___,I, <br /> s <br /> DANE COUNTY <br /> CONDITIONAL USE PERMIT # 2356 <br /> THE ZONING AND LAND REGULATION COMMITTEE OF THE DANE COUNTY <br /> BOARD PURSUANT TO SECTION 10.255(2) OF THE DANE COUNTY CODE OF <br /> ORDINANCES DOES HEREBY: <br /> GRANT Conditional Use Permit# 2356 for a Communication Tower pursuant to Dane <br /> County Code of Ordinance Section 10.194 and subject to any conditions contained <br /> herein: <br /> EFFECTIVE DATE OF PERMIT: August 24, 2016 <br /> THE CONDITIONAL USE SHALL BE LOCATED ON THE PROPERTY DESCRIBED AS <br /> FOLLOWS: <br /> A part of the Southwest Quarter (SW1/4) of the Southwest Quarter (SW1/4) of Section Two (2), <br /> Township Five (5) North, Range Eleven (11) East, Town of Dunkirk, Dane County, Wisconsin <br /> containing 10,000 square feet (0.230 acres) of land and being described by: <br /> Commencing at the Southwest Corner of said Section 2; thence N88°-39'-05"E 547.02 feet along <br /> the South line of the SW1/4 of said Section 2; thence N01°-20'-55"W 523.89 feet to the point of <br /> beginning; thence N00°-00'-00"E 100.00 feet; thence N90°-00'-00"E 100.00 feet; thence S00°- <br /> 00'-00"E 100.00 feet; thence S90°-00'-00"W 100.00 feet to the point of beginning being subject <br /> to any and all easements and restrictions of record. <br /> CONDITIONS: <br /> 1. The primary use of the communication tower permitted under Conditional Use Permit No. <br /> 2356 shall be for the transmission and reception of cellular/PCS wireless voice / data <br /> communications, and related telecommunications equipment. <br /> 2. The communication tower placed, constructed or modified under Conditional Use Permit No. <br /> 2356 shall accommodate the collocation of telecommunications equipment for at least two <br /> (2) additional telecommunications providers. The initial height of the tower shall be 155' <br /> above ground level. However, the tower shall be engineered to be extendable to a <br /> maximum height of 190 feet above ground level. Extension beyond the maximum permitted <br /> height of 190 feet above ground level shall require amendment and approval of a new <br /> Conditional Use Permit. <br /> H:\Zoning\ZLR\Conditional Use Permits\CUP 2300's\CUP #2356.doc <br />