|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02356
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 8:36:18 AM
Creation date
9/6/2016 10:58:59 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02356
Town
Dunkirk Township
Section Numbers
2
AccelaLink
DCPCUP-2016-02356
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
significantly alter the appearance or structural integrity of the tower approved and <br /> permitted under this CUP. <br /> 10. If at any time the communication tower permitted under Conditional Use Permit No. 2356 <br /> ceases to be used for the primary use, as identified in paragraph 1 above, for a continuous <br /> period of 12 months the permit holder shall, upon notification by the committee, dismantle <br /> and remove the tower. If the tower is not removed within 30 days of such notification, Dane <br /> County may enter upon the premises and remove the tower at the expense of the holder of <br /> the conditional use permit. <br /> 11.Prior to issuance of the requested conditional use permit, and as a condition of its continued <br /> validity, applicant shall provide Dane County with a bond, or evidence of an existing bond, <br /> in the amount of $20,000 ensuring performance of applicant's obligation to remove any <br /> communication tower, array or any other equipment or structure placed or erected pursuant <br /> to the conditional use permit, including payment for such removal by Dane County or its <br /> agent, in the event the permit is revoked or the use permitted thereunder ceases for a <br /> continuous period of 12 months. Said bond shall expressly state that it will remain in full <br /> force and effect for a period of at least six months after the surety provides Dane County <br /> written notification of expiration or termination of the surety's obligation under the bond. <br /> Applicant shall remove any communication tower, array or any other equipment or structure <br /> placed or erected pursuant to the conditional use permit no less than 30 days prior to the <br /> termination or expiration of the bond required hereunder. <br /> 12.The applicant shall file a Notice of Proposed Construction on Form 7460-1 to the FAA to <br /> assure that the tower will not impact air traffic. <br /> 13.Contact with Wisconsin DOT Bureau of Aeronautics should be made prior to construction, if <br /> it has not already been done, to determine whether notification to that agency is required. <br /> 14.AII tower components, appurtenances and transmission lines should be securely bonded and <br /> grounded to prevent RF interference caused by stray signals. <br /> 15.A Wisconsin-licensed Structural Engineer will approve and stamp the tower design, and <br /> certify that the tower can support up to three additional cellular/PCS voice / data antenna <br /> arrays. <br /> 16.The applicant shall utilize a galvanized or painted finish on the tower to minimize visual <br /> impact, if permitted by the FAA. <br /> 17.The applicant shall paint steel appurtenances the same color as the tower to minimize visual <br /> impact. <br /> 18.The tower lease area shall be surrounded by a security fence with fabric privacy screening. <br /> 19.Failure to comply with any of the aforesaid conditions shall be grounds for the committee to <br /> immediately revoke Conditional Use Permit No. 2356. <br /> 20.Access to the tower site shall be from US Highway 51. <br /> H:\Zoning\ZLR\Conditional Use Permits\CUP 2300's\CUP #2356.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.