|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00300
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2016 1:37:14 PM
Creation date
9/8/2016 2:38:48 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00300
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'• A Page. 2 of 4 <br /> building with a floor area of no more than 314 square feet <br /> per user sharing the building. Buildings constructed or <br /> used by tower collocators shall be subject to all conditions <br /> established for Conditional Use Permit No. 2007, including <br /> locational requirements contained in the site plan. <br /> 6) The holder of Conditional Use Permit No. 2007 shall, through <br /> ownership, lease, option or other means, at all times have <br /> the right to use the land associated with the permitted <br /> tower for uses related to the use of the collocation sites <br /> required hereunder, including the construction and use of <br /> buildings as permitted under paragraph 5 herein. <br /> 7) The final site plan(s) and design drawings submitted and <br /> dated 2/9/06 included in the petition application are fully <br /> incorporated herein and continued effectiveness of <br /> Conditional Use Permit No. 2007 is expressly conditioned <br /> upon compliance with those plans . <br /> 8) Upon written inquiry by the committee the holder of <br /> Conditional Use Permit No. 2007 shall have the burden of <br /> presenting to the committee credible evidence establishing <br /> to a reasonable certainty the continued compliance with all <br /> conditions placed upon the conditional use permit. Failure <br /> to establish compliance with all conditions placed upon the <br /> conditional use permit shall be grounds for revocation of <br /> the permit. In the event the committee determines that it <br /> is necessary to consult with a third party to ascertain <br /> compliance with conditions on Conditional Use Permit No. <br /> 2007, all reasonable costs and expenses associated with such <br /> consultation shall be borne by the holder of said <br /> conditional use permit . Failure to pay such costs and <br /> expenses or provide information requested by the committee <br /> shall be grounds for revocation of the conditional use <br /> permit. <br /> 9) The holder of Conditional Use Permit No. 2007 shall within <br /> 30 days of any collocation on the permitted tower provide <br /> the committee with written notification of the identity of <br /> the collocator and the nature of the equipment installed. <br /> Within 30 days of the date on which any collocated use <br /> ceases, the permit holder shall provide the committee with <br /> written notice of the cessation of such use . Any changes <br /> due to collocation or otherwise shall be reviewed by the <br /> Zoning Administrator prior to implementation to determine if <br /> permits are needed and to determine that such changes are in <br /> compliance with terms of the CUP and does not significantly <br /> alter the appearance or structural integrity of the tower <br /> approved and permitted under this CUP. <br /> 10) If at any time the communication tower permitted under <br /> Conditional Use Permit No. 2007 ceases to be used for the <br /> primary use, as identified in paragraph 1 above, for a <br /> continuous period of 12 months the permit holder shall, upon <br /> notification by the committee, dismantle and remove the <br />
The URL can be used to link to this page
Your browser does not support the video tag.