|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00585
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2016 2:00:23 PM
Creation date
9/12/2016 2:00:16 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> I, <br /> 1 <br /> you may need this if . . . ! <br /> ! i <br /> 33' l 33' I I <br /> I , I I I <br /> ' <br /> I <br /> e12ac,: _., S 72°57'40" E 254.01' s.e t <br /> I t I 1 Smack <br /> i I v /iii iii ��i�� <br /> O ' <br /> 111.111811110111111 <br /> r r Needs a z <br /> I .... <br /> s..... j Location =' i <br /> w(n , t Survey // r( <br /> O Proposed . 169.8' Se�ac, CD <br /> iv 35. z � ' C 3...ft- _ _ _A z I c 13 <br /> i i <br /> ffr,w.,,(j <br /> / A <br /> _ 1 <br /> r 1 <br /> a, <br /> i se�acr, =z N 72°57'40" W <br /> 33' 33' i <br /> i 1 <br /> 1. I, the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. ', the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning&Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRAT: OwnerfAgent DATE: <br /> Roy Kauper 09/03/16 <br /> SIGNATURE: OwnerfAgent <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.