|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-2016-11027
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPREZ-2016-11027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2016 10:57:18 AM
Creation date
9/14/2016 10:55:00 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
11027
Town
Vermont Township
Section Numbers
5
AccelaLink
DCPREZ-2016-11027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 Kestrel Town of Vermont Risk Assessment Report <br /> - <br /> 5. RECOMMENDATIONS <br /> The table below summarizes Kestrel's recommendations to Town of Vermont based on the information <br /> reviewed during this due diligence risk assessment. <br /> Issues Observations Recommendations <br /> Project noise levels at <br /> property boundaries of <br /> 80-90db for RSC engine Monitor noise levels during the initial testing <br /> Noise related concerns testing are projected by events and document. Communicate <br /> Orbitec. Cannot fully <br /> determine actual noise periodically with neighbors and collect <br /> levels without additional <br /> feedback regarding noise levels. <br /> study. <br /> The RP-1 storage tank <br /> and the test cell Review construction plans and inspect final <br /> Spills facilities/run tanks will constructed facility to ensure adequate <br /> require secondary containment facilities are in place before <br /> containment. The RP-1 operations begin. Review the SPCC Plan for <br /> storage tank will require the RP-1 storage tank. <br /> an SPCC Plan. <br /> Carbon monoxide is <br /> anticipated to be emitted <br /> Air emissions while testing when Determine requirements for an air permit. <br /> combusting three of four <br /> fuel mixtures at the site. <br /> Review construction plans and inspect final <br /> constructed facility to ensure that applicable <br /> Hazardous materials safety regulations, codes and guidelines are <br /> Fire and explosion (fuels) are stored in bulk followed and incorporated into the design and <br /> hazard storage tanks and in run operating plans for the facility. Also ensure <br /> tanks at the test cells that a Risk Management Plan (RMP) is in <br /> during operations. place and that Process Safety Management <br /> and General Duty Clause regulations are <br /> followed. <br /> Construction traffic will Truck/tanker weight should be limited to <br /> include concrete trucks, <br /> stone haulers, equipment weight capacities for township roads being <br /> Road weight capacity and structural steel utilized. Alternately, impacted township roads <br /> haulers. Frequency and such as Cedar Hill Lane should be upgraded <br /> type of fuel product or repaired to meet requirements of modern <br /> deliveries is uncertain at heavy truck traffic. <br /> Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.