|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00275
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2016 1:21:55 PM
Creation date
9/15/2016 1:21:52 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00275
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Gmail-Dane County Zoning Permit Application Submission http://mail.google,com/trail/?ui=1 <br /> • <br /> Gmall Calendar pocuments Photos Reader yieja more• vertuartsegmall.com I Settinos <br /> Newer Version I hjeji2 I Sign out <br /> Search Mall '' Search the Web ' $how search=tog <br /> Gm Create a filter <br /> Compose Mall CNN.com Recently Published/Updated-Clinton slams N. Korea's rhetoric Web Clip < > <br /> Inbox(14) a Back to lnbox Archive Report Spam Delete More actions... <br /> Starred* <br /> Chats S 1 of 96 Older>, <br /> Sent Mali Dane County Zoning Permit Application Submission inbox d <br /> Drafts "webmaster @co.dane.wi.us" show details 10:47 pm (4 minutes ago) 4-, Reply <br /> All Mail Dane County Zoning Permit Submission <br /> Spam(1) <br /> Ib The following Information was submitted at 5/28/2009 10:47:55 PM <br /> from the following IP address: 32.178.142.173 F <br /> Contacts <br /> n <br /> ***************** 10.25(2)(f)Administration, enforcement and penalties. *************** <br /> Labels <br /> Jlmapl/Drafts Coincident with the issuing of a permit, the zoning administrator shall prepare a card <br /> Deleted Messages certifying that a permit has been Issued. This card shall bear the same number as the I- <br /> Sent Messages permit and identify the construction and premises covered by the permit. This card p <br /> Edit labels shall be posted in a conspicuous place on the premises during the construction, and E <br /> no construction shall begin until this card has been posted. For purposes of this b <br /> ordinance, start of construction shall be when any earth disturbing activity takes place <br /> v Invite a friend that will lead to the installation of footings, piers, posts, pilings or foundations. a <br /> Give Gmall to: '^ <br /> ********************* Parcel information*********************** Yt <br /> Parcel Number: 1 <br /> Send Invite Township: PLEASANT SPRINGS F <br /> 50 left Section: 09 <br /> preview Invite <br /> Quarter/Quarter: SE of NW <br /> Property Information <br /> Address: S PARK ST E <br /> Unit Type : C <br /> Unit Number: A <br /> Lot Number: 3 <br /> Block: <br /> Plat Name or CSM: CSM 07643 <br /> New or Add/Alt: ADD/ALT E <br /> Proposed E <br /> Project Description: replace old second story deck with new second story deck F <br /> Category: Residential <br /> Category Other: E <br /> Sewer: Private c <br /> Sanitary Permit Number: 216451 V <br /> Height(ft.): 8'7 <br /> Stories: <br /> Basement Area(sq, ft.): <br /> 1st Floor Area (sq. ft.): C <br /> 2nd Floor Area(sq. ft.): 300 n <br /> 3nd Floor Area(sq, ft.): it <br /> THAI Area fan ft 1. :Inn <br />
The URL can be used to link to this page
Your browser does not support the video tag.