Laserfiche WebLink
o .= ;#4` Dane County Planning and Development Department <br /> Room 116,City-County Building,Madison,Wisconsin 53703 <br /> Fax (608) 267-1540 <br /> Housing& <br /> "` s5g` <br /> ' /lO/0 q - l a< `�+ )4 ) Economic Development <br /> Y Jul 7 2009 <br /> /c Planning <br /> Mr. Mike Crawley (608)266-4251,Rm. 116 <br /> American Garage Builders / �� 1f G g <br /> �a, 2S 1/ ) l�+ ' i— Records &Support <br /> 576 Linnerud Drive lit,/®I (608)266-4251,Rm. 116 <br /> Sun Prairie WI 53590 /I/ /,JI, <br /> Zoning <br /> NOTICE TO SUBMIT A LOCATION SURVEY (608)266-4266,Rm. 116 <br /> Location: 2786 Northwynde Passage, Lot 37,Northwynde,Town of Bristol, Section 29,NW 1/4 NW 'h. <br /> Parcel#: 012/0911-292-2797-1 <br /> Your zoning permit(#20090288)was issued with a condition requiring that a location survey be submitted <br /> to this office after the building's location was established,and before work continued. In your case, a <br /> location survey by a licensed surveyor is required to verify distance for the minimum required setback to the <br /> rear lot line and to the side lot line.Please submit this location survey by mail or hand-deliver to our office, <br /> attention to Russell L. Bartlett. It must reach me within two weeks of the date of this letter or a citation will <br /> be issued for each day of non-compliance. <br /> Continuation of work without submitting a location survey has constituted a violation of the zoning <br /> permit conditions and of the Dane County Code of Ordinances, Chapter 10.25 (see below), and may result <br /> in further enforcement actions. <br /> 10.01 (30m)Location survey, as indicated in this ordinance, refers to survey information prepared by a <br /> licensed surveyor indicating the location of property lines and building location distances from those <br /> property lines for the specific portions of the building indicated in this ordinance. Such surveys are not <br /> required to provide all the parcel information set forth by Wisconsin Administrative Code Chapter A-E 7.02 <br /> Minimum Standards for Property Surveys item A-E 7.01(2) but may exclude unnecessary information as <br /> permitted in A-E 7.01(2)and provide only the information required by the zoning ordinance but such <br /> information must comply with the accuracy standard required by A-E 7.06 Measurements. <br /> 10.25(3)(a) 1.A location survey as defined herein shall be submitted to the zoning division for all <br /> construction, which will be located less than 10'from required setback lines. The survey shall be done at <br /> the time when foundations or basement walls are completed, or when slab is poured. Such survey shall <br /> be submitted to the zoning office prior to the continuation of work on the project. <br /> Thank you for your cooperation, and I look forward to receiving the location survey. <br /> Sincerely, <br /> Russell L. Bartlett,bartlett@co.dane.wi.us, 608-267-3960, Zoning Inspector, County of Dane I/ <br /> Enclosures: Copy ZP20090288 <br /> ***NOTICE TO APPLICANT*** <br /> Return envelope <br />