Laserfiche WebLink
Construction Progress Update-Alden Bosben C: I <br /> • Rezoning: Rezoned one acre from A-1 EX to R-1,no. 9249. r '►' <br /> • Driveway Permit and Erosion Control Plan: Applied for driveway permit. <br /> Completed erosion control plan. Constructed driveway in accordance with <br /> specifications of Dane County and Sun Prairie Township. Permit no. <br /> EC20060206. <br /> • Electrical Power and Telephone: Electrical power and telephone lines are <br /> installed. Temporary electrical service is currently in place for immediate use and <br /> start-up of construction of our house,accessory storage/shop building and <br /> accessory agricultural building. A le nt;T X55 r t e cJ /Q-31 -08 <br /> Z,vs7a./(e J ii-17-08 <br /> • Driveway Permit for Construction: Driveway permit pertinent to construction <br /> has been obtained from the Sun Prairie Township at a cost of$1050. Funds are <br /> held to cover any potential damage done to J.B. Farm Road during the <br /> construction process. pev v i-7_S 5 t o,-0a-0 <br /> • Perk Test: Perk test was conducted by Dane County Department of Human <br /> Services,Environmental Health Division Senior Sanitarion, Scott Podboy,R.S. <br /> Mr. Podboy inspected each dig location. Hammes Soil Testing executed soil <br /> report and plot plan for the drain field. The soil evaluation report has been faxed <br /> to Farwell Pools Inc. and Marshall Plumbing for bids. Both are journeyed <br /> plumbers.revue Ix-08-OS — wt,■.e.•J Oaovc Q•eso/0 C.4)w‘1,1412TeS Si 1 Ploav nlcc/o Z <br /> Al ill aiue= Kc4.10S To f&.Yw4!IpPooI S a"d 41"-" P1 '{ IN5 ?o c.LvA..W rfP / S iAv <br /> oo I tat,/ 5 e1 J• it..—on°on f�ontro. ermrt: Jess Starks,who was very helpful,reviewed our <br /> building site and determined that a Shoreland Erosion Control permit is necessary. <br /> MS. Starks provided a substantial list of civil engineers who could conduct the <br /> requisite work. With the help of our surveyor,Dave Riesop,I narrowed the list to <br /> three. To-date,I've had a meeting,on-site, with Jonathan D. Lefers,P.E. of <br /> Montgomery Associates. Mr. Lefers will discuss his findings with associates and <br /> provide a bid. /kit e.7-�,,j.;TL Sc�S S1 vkk s I a-09.-0 e. <br /> M c-r ' T'- rJauc P.;eso1" ia-X5'-08 <br /> MoA- p/rt,er 're S,,;kit ll Lpwe_ Skove.1∎A _-evbSiosu con)T✓ol 'wet 7-0 ir►e?k e, <br /> • Sit�lan Map et with surveyor,Dave Riesop,to request he draw up a site w ee k -vf T <br /> plan map that will illustrate location of the house,accessory storage building, <br /> accessory agricultural building and the drain field. McT a„Tr� a e. a}cSop I2-i 5-08 <br /> .ill KavG ' -p To -nee-rk_c wee K- o-(' Th.e_ ot2,vcj <br /> • Estimated Construction Start-Date: Target date for commencement of <br /> construction is June 1,2009. <br /> • Load Restrictions: Per a conversation with Sun Prairie Patrolman,Denny,in <br /> accordance with a legal change taking effect in 2009,there will be no load <br /> restrictions on Town roads after May 15th. <br />