Laserfiche WebLink
1-rez ' Y,J DIVISION OF INDUSTRY SERVICES <br /> ' 10541 N RANCH ROAD <br /> D ,. HAYWARD WI 54843 <br /> • %i IK Contact Through Relay <br /> y <br /> ^ i P S:, htip:ildsps.wi.govlprogramsrndustry-services <br /> www.wisconsin.gov <br /> ro,rti° Scott Waiker,Governor <br /> Dave Ross,Secretary <br /> July 06,2015 <br /> CUST ID No. 225394 ATM':PODS Inspector <br /> PAUL A HARDY EYVIRONMENTAL HEALTH DIVISION <br /> CERTIFIED SOIL TESTLNG DA E COUNTY SPIA <br /> 7226 TIMBERWOOD DR 1202 NORTHPORT DR RM 154 <br /> MADISON WI 53719-5256 MADISON WI 53704-2088 <br /> CONDITIONAL APPROVAL <br /> • PLAN APPROVAL EXPIRES:077/06/2017 identification Numbers <br /> Transaction ID No.2564924 <br /> SITE: Site ID No. 814210 • <br /> Paul Houden Please refer to both identification numbers. <br /> Lot 12?every Trail above.in all correspondence with the agency. <br /> Town of Middleton <br /> Dane County <br /> SW1/4,NE1/4,S6,T7N,R8E <br /> Lot 12,Subdivision:Rocky Dell Estates <br /> FOR: <br /> Object Type:POWTS Individual Site Design Regulated Object ID No.: 1542 768 <br /> Maintenance required, 600 GPD Flow rate: System(s):Pressurized In-ground <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes <br /> and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. This system is to be constructed <br /> and located in accordance with the enclosed approved plans and with any component manual(s)referenced above. <br /> The owner,as defined in chapter 101.01(10),Wisconsin Statutes,is responsible for compliance with all code <br /> requirements. <br /> No person may engage in or work at plumbing in the state unless licensed to do so by the Department per 5.145.06, <br /> stars. <br /> The following conditions cha II be met during construction or installation and prior to occupancy or use: <br /> Divert all surface waters away from the soil absorption area. You may wish to consider a curtain drain on <br /> the apslope edge of the property. <br /> Plan the installation around a dry period of the year to ensure best possible installation practices. <br /> Be sure the interface between C-33 mound sand and the in situ sandy loam till shows no compaction or <br /> smearing,again using best installation practices. <br /> • This system has been reviewed and approved as an Individual Site Design.The system shall be constructed in <br /> accordance with the approved plans and ch.SPS 383,R9s.Adm.Code. <br /> A copy of the approved plans,specifications and this letter shall be on-site during construction and open to <br /> inspection by authorized representatives of the Department,which may include local inspectors. All permits <br /> required by the state or the local municipality shall be obtained prior to commencement of <br /> cons tru ctionlins tal latiora'operation. <br />