|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00590
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2016 3:14:29 PM
Creation date
9/21/2016 3:14:12 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00590
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• During the months of May-June 2015 Dettmann Vineyards, Roger Lane and the <br /> Dane County Zoning Department informed Dettmann Vineyards that certain <br /> aspects of the business plan and building did not comply with Al-EX zoning. <br /> Dettmann Vineyards updated their plans to what they believed would allow them <br /> to comply. <br /> • On July 20th, 2015 Dettmann Vineyards was given approval for building of a <br /> 15,000 sq ft to be built on the Dettmann's property. <br /> • On August 25th, 2015 The Building Permit was revoked due to material <br /> misrepresentation. <br /> • On September 14th, 2015 a revised Zoning Permit Application was filed by <br /> Dettmann Vineyards to Dane County Zoning. This new permit included updates <br /> to the building and business plans. The updates addressed the material <br /> misrepresentation stated on the prior building permit revocation. This permit was <br /> denied on September 18th, 2015. <br /> • On September 21st, 2015 Dettmann Vineyards met with Roger Lane and Todd <br /> Violante to work through the outstanding discrepancies preventing an approved <br /> Zoning Permit Application for an AG-Accessory building. During this meeting, <br /> Roger stated the building plans as submitted did not show an acceptable AG <br /> use. During a lengthy conversation with Roger and Todd, the group concluded <br /> that a detailed resubmittal was needed. This Zoning Application re-submittal <br /> needed to included detailed building use information that justified the size of the <br /> building and Ag use of the building. <br /> • On September 28th, 2015 the Zoning Application re-submittal was filed. This <br /> Application included a reduced building footprint and building use allocation with <br /> detailed Ag operations. <br /> • On October 2nd, 2015 Dettmann Vineyards received notice that this permit was <br /> again denied. <br /> Dettmann Vineyards is a newer business and there has been a steep learning curve <br /> with regards to Zoning Permit Application process. At times, the process has been <br /> taxing, but Dettmann Vineyards recognizes that Roger Lane was in the right to deny the <br /> previous Zoning Permit Applications. The prior Zoning Permit Applications did not <br /> provide substantial evidence to receive a permit. Dettmann Vineyards acknowledges <br /> that these missteps have caused this process to be more lengthy and daunting than <br /> required. In an effort to persevere, Dettmann Vineyards has taken a lengthy amount of <br /> time to re-work the business and building plans. We are excited to illustrate how <br /> Dettmann Vineyards has become a productive agricultural operation and how that <br /> operation will continue you grow. In addition, the Agricultural building plans have been <br /> revised to reflect the current agricultural land use. <br />
The URL can be used to link to this page
Your browser does not support the video tag.