|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00626
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00626
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2016 3:17:48 PM
Creation date
9/21/2016 3:17:42 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00626
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8/31/2016 <br /> CL ARY P.0 Box 930220 SHEA,STEVE <br /> Verona, WI 53593-0220 Doc ID:5129820160831102958 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> Cleary Building.corn Fax:(608)845-7070 Cleary/Owner Project Contract - Erected <br /> Truss Type <br /> m60€ t �-;,....--COLUMN <br /> Note:Clearance may be reduced by finished floor height. <br /> ° /��__ Roof Pitch: 3/12 <br /> "' � Roof Peak Height: 21' 1" <br /> "A" =Actual Eave Height: 17'4" <br /> 1. <br /> Q <br /> i "B" = Truss clearance at heel and center: 16' 0" <br /> m (Truss clearance = 1'-0" less than nominal eave height, in most cases. <br /> — _ I 4,100+0" If nested purlins are used,truss clearance will be increased by 4".) <br /> Standard Lower Chord Truss(SLC) <br /> Overhead Frameout & Headroom <br /> "D" = Bottom elevation (B.E.)of overhead door: 0'4" <br /> _ The bottom of all overhead doors(top of finished floor)are <br /> ,_-.-- recommended to be placed at 4" above the 100'-0" mark(100'-4"). In <br /> 4YU"' <br /> ---- building without paved floors, B.E.of doors may be lower-e.g.100'- <br /> rRLcS 0". <br /> 1 I) ;— "E" = Height of overhead door: 14' 0" <br /> w t_-_t a y` Overhead door height = the height of the overhead door being placed <br /> _ { in this building. <br /> a 1 <br /> §' "F" = Available headroom: 1'7" <br /> "pa I '°1 Available headroom = the space available for overhead door tracks <br /> '5_Lt and openers. If a ceiling is installed, headroom will be reduced by <br /> Z L.` about 1". Door headroom requirements must be confirmed with the <br /> s i- <br /> ,--TOP OF 04151-0 8 j * Z door supplier. <br /> i 1 FLOOR g. <br /> �•{,• i +. --,- ,k _ Headroom calculation formula: <br /> ' • • - z („B„)_ („D,•)- („E•,) = (,F,) <br /> Q° (Truss Clearance) - (B.E. of overhead door) - (Overhead door height) = <br /> (Available headroom) <br /> Example: <br /> (10'-0") -(4")- (8'-0") = (1'-8" of available headroom) <br /> C-500 R <br /> v12/10 built with pride before the 0 is applied 14 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.