Laserfiche WebLink
BIRRENKOTT PLOT PLAN <br /> SURVEYING, INC. <br /> P.O. Box 237 <br /> 1677 N. Bristol Street <br /> Sun Prairie, WI. 53590 <br /> Phone (608) 837-7463 <br /> Fax (608) 837-1081 <br /> Description: <br /> LOT 1, CERTIFIED SURVEY MAP NO: <br /> 13201, LOCATED IN THE SOUTHEAST <br /> 1/4 AND THE NORTHEAST 1/4 OF <br /> SECTION 21, T7N, R12E, TOWN OF <br /> DEERFIELD, DANE COUNTY, WISCONSIN. <br /> SCALE 1" = 40' <br /> S5 <br /> 0 40 80 <br /> UNPLATTED LANDS <br /> II <br /> I JJ. <br /> I N88°1939"E 125.00' <br /> 6I6• I .,O <br /> I 2ti o <br /> N 88°1939"E A <br /> I III%\\34.00' LOT 1 <br /> I CERTIFIED SURVEY <br /> MAP NO: 13201 <br /> I <br /> I L1.I <br /> W <br /> fto <br /> I O <br /> I w <br /> ii <br /> H h 7. <br /> I Z N <br /> I Q / ;,, 22' 22'7_ &Q 24.00' <br /> X42 1I— . 1 � S 88°1939"W <br /> 5' <br /> w DECK I <br /> I <br /> I <br /> Z. 1 r Z 7'PROPOSED 6 -r 8 <br /> I I� h HOUSE I <br /> ' / -ORCH I UNPLATTED LANDS <br /> I 1 ° il <br /> �5' v <br /> I 7 1 26.2• <br /> 2 5.7' <br /> 'OSED . 1 <br /> i) 30�_I A 'DRIVEWAY N GARAGE io 1 <br /> I Iy N <br /> Y .ro•I w0 <br /> ON <br /> ir Y Length of Proposed <br /> Driveway Centerline: 92.2' I ° <br /> 2 1 b I rn �± N <br /> ,. 1 0 ./1 <br /> I h v. <br /> 6I6. O <br /> - - - 1 <br /> y <br /> I G. STORM SEWER EASEMENT u <br /> 5.11' <br /> SOUTH 10' OF LOT Z BLOCK 4 <br /> 1o.2a'c'�, S88°1939"W 135.00' - HOWE'S ADDITION TO THE <br /> ,V I VILLAGE OF DEERFIELD <br /> I I <br /> LOT 1, BLOCK 4 I <br /> I I <br /> HOWE'S ADDITION TO THE I <br /> I VILLAGE OF DEERFIELD I <br /> I Legend: <br /> — - - — = Building Setback Line Prepared For: <br /> -• -..- - = Proposed Driveway Centerline Tim Dahl <br /> • = 3/4" Iron Bar N4321 Poplar Avenue <br /> Cambridge, WI 53523 <br /> (per Certified Survey Map No: 13201) (608)-220-2100 <br /> Revised: September 2, 2016 <br /> Revised: September 1, 2016 <br /> Revised: August 18, 2016 For your/our protection...have the Building Inspector/Developer sign off on the Plot <br /> Dated: August 16, 2016 (site) Plan accepting the Plan as correctly meeting setback and deed restrictions for <br /> Surveyed: the parcel PRIOR to staking. Note: Plot Plan MUST BE APPROVED by the governing <br /> Drawn: B.P.R. Municipal Building Authority. ANY staking, without municipal/Developer approval, may be <br /> Checked: T.K. subject to change at the client's expense. <br /> Approved: D.V.B. <br /> Field book: Surveyor has not field verified elevations and can not certify to their accuracy. <br /> Comp. File: J:\2016\CARLSON Elevations have been provided and determined by the client. Contractors and excavators <br /> Office Map No. 160703 are to field verify and establish site grades. <br /> SHEET 1 OF 1 <br />