|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02351
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 2:23:40 PM
Creation date
10/12/2016 2:19:07 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02351
Town
Springfield Township
Section Numbers
35
AccelaLink
DCPCUP-2016-02351
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Ordinary hours of operation will be: 6:00 a.m. to 7:00 p.m. Monday through Friday; 6:00 a.m. <br /> to 12:00 p.m. Saturdays; none on Sundays or state legal holidays. To accommodate the work <br /> schedules of construction projects, production may occur between 7:00 p.m., and 6:00 a.m., <br /> as needed to provide concrete for that project. Construction crews, equipment and vehicles <br /> not involved in batch plant operations may enter and leave the facility outside of the stated <br /> hours of production activities. Supplies and equipment may be loaded and unloaded from <br /> vehicles outside of the stated hours for noise-producing activities. In addition, equipment and <br /> vehicles may be repaired and maintained at the repair facilities outside of the stated hours for <br /> batch plant activities. Some equipment warm up and cool down time may also be required. <br /> The batch plant operation shall not generate more than 70 decibels of noise measured at the <br /> property line. <br /> 5. The aggregate production facility, raw materials and vehicle paths shall be laid out with a <br /> "flow through" traffic pattern" which minimizes the need for vehicles to back up. The plant <br /> shall be no larger in capacity than the plant which was on the site in 2008. Limit night hours <br /> of operations to a maximum of 100 nights per season. Lighting for the concrete batch plant <br /> is to shine down into the quarry so as not to disturb the neighborhood when operating <br /> throughout the night. <br /> 6. The operator shall meet DNR standards for particulate emissions as described in NR415.075 <br /> and NR415.076. <br /> 7. The Zoning Administrator or designee may enter the premises of the operation to inspect <br /> those premises with reasonable advance notice to ascertain compliance or to investigate an <br /> alleged violation. Anyone inspecting the property will be escorted by Yahara Materials and will <br /> comply with all safety regulations. <br /> 8. Unless required by Town of Springfield ordinance or other governmental regulation, all truck <br /> traffic will be directed to Highway 12 and not east to Green Briar Road. Yahara Materials shall <br /> notify the truck drivers doing business at the site of this condition. The operator shall <br /> designate a traffic route for each project which shows the route to be taken from the quarry to <br /> the destination of the trucks. Notification of routes, dates and projects to be provided to the <br /> Town and surrounding neighbors. <br /> 9. A spill prevention and emergency response plan shall be in place and apply to all operations <br /> on the site including subcontractors and suppliers. <br /> THE ZONING AND LAND REGULATION COMMITTEE AFTER PUBLIC HEARING <br /> AND IN THEIR CONSIDERATION OF THE CONDITIONAL USE PERMIT MADE THE <br /> FOLLOWING FINDINGS OF FACT: <br /> 1. That the establishment, maintenance and operation of the proposed conditional use will not be <br /> detrimental to or endanger the public health, safety, morals comfort or general welfare. <br /> 2. That the uses, values, and enjoyment of other property in the neighborhood for purposes already <br /> permitted will not be substantially impaired or diminished by the establishment, maintenance, and <br /> operation of the proposed conditional use. <br /> 3. That the establishment of the proposed conditional use will not impede the normal and orderly <br /> development and improvement of the surrounding property for uses permitted in the district. <br /> H:\Zoning\ZLR\Conditional Use Permits\CUP 2300's\CUP #2351.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.