Laserfiche WebLink
Proposed Conditional Use Permit #2351 <br /> In order for an applicant to obtain a Conditional Use Permit, the Zoning and Land Regulation <br /> Committee must find that all of the following standards are met for the proposed land use: <br /> 1. The establishment, maintenance,or operation of the conditional use will not be detrimental to or endanger the <br /> public health,safety,comfort or welfare. <br /> 2. The uses,values and enjoyment of other property in the neighborhood for purposes already permitted shall be in <br /> no foreseeable manner substantially impaired or diminished by establishment, maintenance or operation of the <br /> conditional use. <br /> 3. The establishment of the conditional use will not impede the normal and orderly development and improvement of <br /> the surrounding property for uses permitted in the district. <br /> 4. Adequate utilities,access roads,drainage and other necessary site improvements have been or are being made; <br /> and <br /> 5. That adequate measures have been or will be being taken to provide ingress and egress so designed as to <br /> minimize traffic congestion in the public streets;and <br /> 6. That the conditional use shall conform to all applicable regulations of the district in which it is located. <br /> Staff has prepared a list of conditions that may be used in order to meet the six standards as <br /> listed above to allow the conditional use on the property. Please note that the conditions may <br /> need to be changed or additional conditions added to address potential nuisances that may <br /> come to light during the public hearing. <br /> 1. The applicant shall submit an erosion control plan covering the entire CUP area for the duration of aggregate <br /> production operations that meets with the approval of the Dane County Land Conservation Department and receive <br /> approval of an erosion control permit from the Dane County Planning and Development Department before the <br /> aggregate production may commence. <br /> 2. The applicant shall apply for and receive any other required local, state and federal permits before production <br /> commences and proof of such permits shall be filed with both Dane County Planning and Development Department <br /> and the Town of Springfield. <br /> 3. Operations shall cease no later than November 30, 2026. The operator will conduct a mandatory review with the <br /> Town in 5 years (2021). The Town reserves the right to have an annual review if issues arise. The plant shall <br /> be removed within ten(10)days of cessation of operations. The operator may apply for renewal of this CUP before <br /> its expiration. <br /> 4. Ordinary hours of operation will be: 6:00 a.m. to 7:00 p.m. Monday through Friday; 6:00 a.m. to 12:00 p.m. <br /> Saturdays; none on Sundays or state legal holidays. To accommodate the work schedules of construction projects, <br /> production may occur between 7:00 p.m., and 6:00 a.m., as needed to provide concrete for that project. <br /> Construction crews, equipment and vehides not involved in batch plant operations may enter and leave the facility <br /> outside of the stated hours of production activities. Supplies and equipment may be loaded and unloaded from <br /> vehicles outside of the stated hours for noise-producing activities. In addition, equipment and vehides may be <br /> repaired and maintained at the repair facilities outside of the stated hours for batch plant activities. Some <br /> equipment warm up and cool down time may also be required. The batch plant operation shall not generate more <br /> than 70 decibels of noise measured at the property line. <br /> 5. The aggregate production facility, raw materials and vehicle paths shall be laid out with a "flow through"traffic <br /> pattern" which minimizes the need for vehicles to back up. The plant shall be no larger in capacity than the <br /> plant which was on the site in 2008. Limit night hours of operations to a maximum of 100 nights per season. <br /> Lighting for the concrete batch plant is to shine down into the quarry so as not to disturb the neighborhood <br /> when operating throughout the night. <br /> Continued to page 2 <br />