|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00654
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 3:49:44 PM
Creation date
10/17/2016 12:00:50 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00654
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,. Y-o,6<•,, <br /> Qj 1 Dane County Planning & Development <br /> =� `� � Zoning Division <br /> ,f <br /> ec0 <br /> ZONING PERMIT INSPECTION REQUIREMENTS <br /> The Dane County Zoning Ordinance provides that two inspections shall be made by the Zoning Division. <br /> Instructions are as follows: <br /> 1. The permit card shall be posted on the premises before any earth disturbing activity is started. <br /> 2. The owner or agent shall have all lot corners visibly staked prior to requesting an inspection.The Zoning <br /> Inspector shall not be responsible for determining the location of lot lines. Please be advised that zoning <br /> ins se '••- . - a•e In r= - upon your correct identification of property boundaries and lot lines. <br /> 3. FIRST INSPECTION: <br /> a. Is a location survey required? No <br /> If yes, a first inspection phone call request is not required. Please arrange to have a copy of the survey <br /> delivered to our department prior to any construction above the foundation. <br /> b. If no,the owner or agent shall request the first inspection when the foundation or basement walls have <br /> been constructed. Footings only are not considered a foundation. The locational extent of the permitted structure <br /> must be identifiable at the time of the first inspection. Construction may continue only after an inspection has been <br /> re• -- a• <br /> 4. SECOND INSPECTION: Shall be requ ted when the building is substantially completed. Interior trim, <br /> •- '•s •-'• '•• - •• •• •- e-to a finished prior to the inspection but, interior walls must be in place and <br /> the electrical, plumbing and heating services must be installed and operating. <br /> 5. CERTIFICATE OF COMPLIANCE: The zoning inspections are made to verify compliance with the regulations <br /> of the zoning ordinance. The Zonin• D i _:• ••_� ompletion of both inspections will issue a certificate of <br /> compliance. <br /> To schedule a • pection, call 266-4266, Monday through Friday, ;:00 AM-4:00 PM. You will be given an <br /> inspection -quest number,which will serve as a verification of your •all. <br /> -rmit Number DCPZP-2016-00654 <br /> IMPORTANT: The two inspections required by the Zoning Ordinance can only be made by the Zoning Department. <br /> **TOWN PERMITS: For information regarding Town permits, contact TOWN OF BRISTOL <br /> the <br /> ( i Town <br /> > <br /> V <br /> Ke v\ at 6 0 U 3 ) r 3 <br /> Building Inspector/Clerk Phone Number <br /> 210 Martin Luther King Jr.Blvd.0 City-County Bldg,Room 116 0 Madison,WI 53703-3342 0 Phone:608.266.4266 0 Fax:608.267.1540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.