Laserfiche WebLink
COMMON QUESTIONS ABOUT COLLADAY POINT REZONING, p. 2 <br /> and built. <br /> 7. Is there any other way for the County to be assured that the present land use will be <br /> retained while it is being developed? <br /> No. <br /> Unless the owner was to voluntarily allow an easement on the property for a siltation pond <br /> or agree to build county-engineered and designed siltation pond, the owner may solve the <br /> runoff from another property onto his own in any manner he wishes. This includes piping <br /> the silt water straight into the lake. <br />