Laserfiche WebLink
9 DANE COUNTY DEPARTMENT of PUBLIC <br /> .^ WORKS, HIGHWAY and TRANSPORTATION <br /> County Executive 1919 Alliant Energy Center Way• Madison,Wisconsin 53713 Commissioner/ Director <br /> Joseph T. Parisi Phone: (608) 266-4018 • Fax: (608)267-1533 Gerald J. Mandli <br /> August 4,2016 <br /> ATTENTION ALL REQUEST FOR BID(RFB)HOLDERS <br /> RFB NO.316031-ADDENDUM NO. 1 <br /> CONSTRUCT GENERATOR BUILDING <br /> DANE COUNTY LANDFILL SITE#1 <br /> 6718 EAST VERONA AVENUE <br /> VERONA,WISCONSIN <br /> BIDS DUE: Thursday;August 11,2015, 2:00 PM. <br /> DUE DATE AND TIME ARE NOT CHANGED BY THIS ADDENDUM <br /> This Addendum is issued to modify, explain or clarify the orifinal Request for Bid(RFB)and is <br /> hereby made a part of the RFB. Bidders must acknowledge this addendum on the bid form. <br /> PLEASE MAKE THE FOLLOWING CHANGES: <br /> 1. Section 01 00 00—General Requirements <br /> a. Article 1.2-SUMMARY OF WORK,Paragraph A: <br /> CHANGE: "Project Description: Perform the Work as specified and detailed in <br /> Construction Documents package.Contractor to provide construction services for a pre- <br /> engineered metal building of approximately 1,056 square feet including associated site <br /> work,concrete work, and HVAC work."TO READ: "Project Description: Perform the <br /> Work as specified and detailed in Construction Documents package. Contractor to <br /> provide construction services for a pre-engineered metal building of approximately 1,104 <br /> square feet including associated site work, concrete work, and HVAC work." <br /> b. Article 1.17—QUALITY ASSURANCE/QUALITY CONTROL OF INSTALLATION, <br /> Paragraph A: <br /> CHANGE: "Monitor quality control over suppliers,manufacturers,Products,services, <br /> site conditions, and workmanship,to produce work of specified quality."TO READ: <br /> "County to monitor quality control over suppliers,manufacturers,products, services, site <br /> conditions,and workmanship,to produce work of specified quality." <br /> c. Article 1.17—QUALITY ASSURANCE/QUALITY CONTROL OF INSTALLATION, <br /> Paragraph B: <br /> CHANGE: "Comply fully with manufacturers'instructions."TO READ:"Contractor to <br /> comply fully with manufacturers' instructions." <br /> d. Article 1.17—QUALITY ASSURANCE/QUALITY CONTROL OF INSTALLATION, <br /> Paragraph C: <br /> CHANGE: "Comply with specified standards as minimum quality for the Work except <br /> when more stringent tolerances,codes,or specified requirements indicate higher <br /> standards or more precise workmanship."TO READ: "Contractor to comply with <br /> Addendum No. 1 <br /> RFB No. 316031 - 1 - rev. 08/14 <br />