Laserfiche WebLink
Non-metallic Mining Reclamation <br /> Application Checklist <br /> Applicant Zoning LCD <br /> Plan Requirement i Location in Plan -page number I I <br /> 1. Site information-maps of the site including the general location,property MINING RECLAMATION <br /> boundaries,aerial extent,geologic composition and depth of the deposit,the PLAN (MRP PAGES 1-2) t. <br /> distribution,thickness and type of soil,the approximate elevation of ground MAPS #1-3 <br /> water,the location of surface waters and the existing drainage patterns. <br /> 12. Biological resources-plant communities and wildlife use at and adjacent MRP PAGE 2 <br /> to the site. MAPS #1-3 <br /> 3. Existing topography-contour maps of the site at ten foot contour intervals. MAP#2 1.-" <br /> MRP PAGE 2, MAPS #1-3 <br /> d. Location of manmade features-on or near the site. ✓ <br /> MRP PAGE 2, MAPS#1-3 <br /> 5. Plan view-(existing mines)showing the location and extent of land <br /> previously affected by non-metallic mining for existing sites. <br /> MRP PAGE 2, MAPS #1-3 <br /> 6. Post-mining land use-consistent with local land use plans/local zoning <br /> YES, MRP PAGES 2-3 <br /> 7. Under exclusive agricultural zoning? ✓ <br /> -- — . MAP#1 <br /> 8. Reclamation measures-description of the proposed reclamation.including MRP PAGE 3, MAPS#1-3 <br /> methods and procedures to be used and a proposed schedule for the V <br /> completion of reclamation. <br /> MRP PAGE 3, MAP#2 <br /> 9. Proposed earthwork and reclamation-final slope angles,high wall ✓ <br /> reduction, benching ann terracing. <br /> MRP PAGE #3, MAPS #2-3 <br /> 10.Methods of topsoil-topsoil substitute material removal and storage. <br /> MRP PAGE 3, MAP #2 <br /> 11.Anticipated topography of the reclaimed site. ✓ <br /> MRP PAGE 3, MAP #2 <br /> 12.Plan map that shows surface structures-after the cessation of mining. <br /> '3.Estimated cost of reclamation. MRP PAGE 3, MAP #2 ✓ <br /> 14.Revegetation plan-shall include timing and methods of seed bed MRP PAGE 4, MAP #2 <br /> preparation,rates and kinds of soil amendments,seed application timing, ✓ <br /> methods and rates,mulching and any other techniques needed to accomplis <br /> soil and slope stabilization. <br /> 15.Standards for revegetation-may be based on the percent of vegetative MRP PAGE 4, MAP#2 <br /> V. <br /> cover,productivity,plant density,diversity or other applicable measures. <br /> MRP PAGE 4, MAPS #1-3 <br /> '16. Erosion control and stormwater-chapter 14 requirements. <br /> ✓ <br /> 17.Description of interim reclamation. MRP PAGE 4, MAP#2 ✓ <br /> 18.Financial assurance-$1500/acre. MRP PAGE 4 ✓ <br /> 519414 Mores: .t I - Z p-r}-t DP .-Ae.PQSIT IS TO . E St: av r ELEv,4i10i■-i OF <br /> 4- II? - NO EC Cr+ECLLLtST— VJe..t E1> . <br />