|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00748
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2016 4:18:27 PM
Creation date
11/21/2016 11:22:36 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00748
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Water Resource Engineering Division <br /> DINAP - "DO I NEED A PERMIT" <br /> General Information: <br /> Date of Contact: 11/10/2016 <br /> caller/contact: Eric Schumann- Clean Fuel Partners Phone#: (608) 445-3568 <br /> Landowner: Dane County Phone#: <br /> Contact Email: eschumann @cleanfuelpartners.com <br /> Project Address: 6321 Cuba Valley Rd <br /> Location(Municipality): Vienna Section: 31 1/4: <br /> Parcel #: 0909-312-8800-0 <br /> Project Description: New manure reception building <br /> Planned Size of Disturbance: —2,000 ft2 Planned Size of New Impervious: 1,344 ft2 <br /> Water Resource Engineering Division Response: <br /> Based On Information Above the Project:IN DOES* DOES NOT Require a Permit <br /> Determination Made by: DAN DDB r4JAS ❑JAH ❑JRT ❑AJM ❑JRR <br /> Type of Permit Required: Erosion Control EShoreland Erosion Control SIStormwater Management <br /> ❑Disturbance >4000 ft2 ❑ Excavate/Fill>400 yds3 ❑ Disturbing 100' of ditch/channel <br /> ❑ 125'Long new access road/driveway❑ Subdivision Plat/CSM ❑ 20,000 ft2 New Impervious areas <br /> ❑Shoreland Zone Disturbance 0 Other: New building will change SM plan <br /> Basis for Determination: Any change to Stormwater Management for the site must be <br /> documented in a plan revision and approved before development takes place. <br /> No erosion control permit is needed unless land disturbing activity >4,000 sq.ft. <br /> Permit determination is based upon the information provided by caller/landowner on the date of contact. <br /> Changes in project size,scope or location may trigger changes to permit requirements. <br /> It is the responsibility of the owner to ensure all required permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.