|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00727
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00727
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2016 4:26:32 PM
Creation date
11/21/2016 2:53:10 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00727
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e I► o. Dane County Planning & Development <br /> VA,ri-r Zoning Division <br /> ZONING PERMIT INSPECTION REQUIREMENTS <br /> The Dane County Zoning Ordinance provides that two inspections shall be made by the Zoning Division. <br /> Instructions are as follows: <br /> 1. The permit card shall be posted on the premises before any earth disturbing activity is started. <br /> 2. The owner or agent shall have all lot corners visibly staked prior to requesting an inspection.The Zoning <br /> Ir_lsjaCtOLS haIJ not be responsible for determining the location of lot lines. Please be advised that zoning <br /> ,/1 ctlons are made 4 nce upon your correct identification of property boundaries and lot lines. <br /> (3.ZIRST INSPECTION: <br /> a. Is a location survey required? No <br /> If yes,a first Inspection phone call request is not required.Please arrange to have a copy of the survey <br /> delivered to our department prior to any construction above the foundation. <br /> b. If no,the owner or agent shall request the first Inspection when the foundation or basement walls have <br /> been constructed.Footings only are not considered a foundation.The locational extent of the permitted structure <br /> must be identifiable pt a tim of the first inspection.Construction may continue only after an inspection has been <br /> requestt3tt" <br /> 4. SECOND INSPECTION: Shall be reque tad when the building Is substantially completed.Interior trim, <br /> carpeting,painting,etc.,do not have to_be`finished prior to the inspection but,interior walls must be in place and <br /> electricalrplumbing.and-heating services must be Installed and operating. <br /> 5. CERTIFICATE OF COMPLIANCE:The zoning Inspections are made to verify compliance with the regulations <br /> of the zoning ordinance.The Zonin Division,upon completion of both inspections will issue a certificate of <br /> compliance. "" _�.. <br /> To schedule an-in tion,call 266-4266, Monday through Friday, :00 AM-4:00 PM.You will be given an <br /> inspection'* nest number,which will serve as a verification of your all. <br /> 'ermit Number DCPZP-2016-00727 _ <br /> .-- <br /> �. - <br /> IMPORTANT:The two inspections required by the Zoning Ordinance can only be made by the Zoning Department. <br /> **TOWN PERMITS: For information regarding Town permits,contact TOWN OF COTTAGE GROVE <br /> the <br /> Teen <br /> V <br /> i IG t � at 6 DO - g32 "r 3 3 ) f l <br /> Building inspector/Clerk Phone Number <br /> 210 Martin Luther King Jr.Blvd.0 City-County Bldg,Room 116 0 Madison,W15370 -3342 0 Phone:608.268.4266 0 Fax:608.287.1540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.