|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-00462
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPCUP-0000-00462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 2:32:21 PM
Creation date
11/29/2016 1:27:52 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
00462
Town
Madison Township
Section Numbers
35
AccelaLink
DCPCUP-0000-00462
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JOE DANIELS CONSTRUCTION CO., INC. <br /> General Contractors <br /> 919 APPLEGATE ROAD <br /> MADISON, WI 53713 S c <br /> (608) 271-4800 <br /> JUL July 17, 1986 JU 18 1985 <br /> DANE GEIV T <br /> LAND RED. & RECORDS <br /> Dane County Agriculture, Environment <br /> and Land Records Committee <br /> Room 116 <br /> City County Building <br /> Madison, WI 53709 <br /> Attn: Norb Scribner <br /> Re: Conditional Use Permit No. 462 <br /> Madison Pentecostal Assembly Church <br /> This is a letter in response to your letter dated July 9, 1986. <br /> During construction we will be installing the gravel drive at the start of <br /> construction. If we use the existing drive on the east side, it could kill <br /> the pine trees that are so close to the driveway. <br /> As for erosion control, we will be using erosion control filter fence along <br /> the west side of the property and along the front of the site. We will main- <br /> tain the fence by cleaning out the sediment and by keeping the fabric up on <br /> the stakes. <br /> Our plans are that the driveway will be sloped enough to dissipate the water <br /> to the sides of the driveway and into the lawn. We will be sodding the low <br /> areas to resist any erosion. The seeded areas will be mulched. <br /> We will be concentrating our efforts on getting the exterior work done as <br /> soon as possible so the grass seed has a chance to germinate. We expect <br /> the exterior work to be done by mid to late September depending on construc- <br /> tion start and the weather conditions. <br /> If you have any further questions, please feel free to call me on any matter. <br /> I will wait to hear from you in writing for approval on the above items. <br /> Sincerely, <br /> ‘ c <br /> Donald A. McCall <br /> bld <br />
The URL can be used to link to this page
Your browser does not support the video tag.