Laserfiche WebLink
• <br /> 7. Grading must be confined to the areas shown on the plan. No material storage,vehicle <br /> traffic or grading may occur in the areas identified as"undisturbed"or"vegetated <br /> buffer"on the plan. In the event any of these areas are disturbed,additional erosion <br /> control measures will be required. <br /> 8. The plan includes a construction schedule as follows: <br /> Construction and grading is scheduled to begin upon permit issuance. <br /> Disturbance associated with driveway construction must be stabilized by July <br /> 30,2018. <br /> Disturbed areas adjacent to the home must be heavily straw or woodchip <br /> mulched by September 12,2016. Mulch must be reapplied as necessary to <br /> maintain 70%cover(no bare soil visible). <br /> All disturbed areas must be permanently restored,as noted in the plan, by July <br /> 30,2018. <br /> The construction site must follow the plan according to the schedule approved by Dane County <br /> Water Resource Engineering.This permit will expire on the stabilization date included in the <br /> plan(July 30,2018)and is not eligible for extension.This review is for the erosion control <br /> requirements of Chapter 11, Dane County Code of Ordinances only and other approvals may be <br /> necessary.A permit card must be obtained from Water Resource Engineering and displayed <br /> onsite prior to disturbing ground. <br /> Cc: Aaron Falkosky, P.E., Quam Engineering, LLC(email) <br /> Eric Rortvedt, P.E.,Wisconsin Department of Natural Resources (email) <br />