|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00758
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00758
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2016 10:15:02 AM
Creation date
12/1/2016 3:56:31 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00758
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur in the areas identified as"undisturbed"or"vegetated <br /> buffer"on the plan. In the event any of these areas are disturbed, additional erosion <br /> control measures will be required. <br /> 8. The plan includes a construction schedule as follows: <br /> Construction and grading is scheduled to begin upon permit issuance. <br /> Disturbance associated with driveway construction must be stabilized by <br /> October 15,2015. <br /> Disturbed areas adjacent to the home must be heavily straw or woodchip <br /> mulched by October 1, 2015. Mulch must be reapplied as necessary to maintain <br /> cover. <br /> All disturbed areas must be permanently restored, as noted in the plan, by May <br /> 31, 2016. <br /> The construction site must follow the plan according to the schedule approved by Dane County <br /> Water Resource Engineering.This permit will expire on the stabilization date included in the <br /> plan(May 31,2016)and may be amended prior to permit expiration only.This review is for <br /> the erosion control requirements of Chapter 14, Dane County Code of Ordinances only and <br /> other approvals may be necessary.A permit card must be obtained from Water Resource <br /> Engineering and displayed onsite prior to disturbing ground. <br /> Cc: Ryan Quam, P.E.,Quam Engineering, LLC(email) <br /> Eric Rortvedt, P.E.,Wisconsin Department of Natural Resources(email) <br />
The URL can be used to link to this page
Your browser does not support the video tag.