|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00939
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 4:20:39 PM
Creation date
12/6/2016 10:07:37 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00939
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
°;3, Land Conservation Division <br /> Dane County Land&Water Resources Department <br /> Patrick J.Sutter,County Conservationist <br /> A) ' <br /> DATE: December 19, 2008 <br /> TO: Douglas & Kathryn Barton <br /> Owners <br /> FROM: Jason Tuggle <br /> Erosion Control Specialist <br /> RE: Barton Residence- Shoreland Erosion Control Plan, SE2008-0378 <br /> The submitted shoreland erosion control plan meets the needs of the site and includes the <br /> following requirements: <br /> 1. The site will only be accessed off Bible Camp Road using a stone tracking pad. The pad <br /> must be a minimum of 30' long x 20' wide x 12" deep and be constructed of 3-inch clear <br /> stone. No other site access may be used and material deposited in the road will be <br /> cleaned up at the end of each workday. <br /> 2. Silt fence must be installed prior to grading in the locations shown on the plan and where <br /> deemed necessary, including down slope of all soil stockpiles. The silt fence must be <br /> maintained until the site is vegetated and stabilized. <br /> 3. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur in the areas identified as"undisturbed" or"vegetated buffer" <br /> on the plan. In the event any of these areas are disturbed, additional erosion control <br /> measures will be required. <br /> 4. The plan includes a construction schedule as follows: <br /> Grading and construction is scheduled to begin December 29, 2008. <br /> All disturbed areas must be temporarily seeded and mulched by February 15, <br /> 2009. <br /> All disturbed areas on site must be permanently restored with seed and mulch by <br /> June 30, 2009. <br /> The construction site will follow the plan according to the schedule approved by Dane County <br /> Land Conservation. This permit will expire on the stabilization date included in the plan <br /> (June 30,2009) and may be amended prior to permit expiration only. This review is for the <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 1 Fen Oak Court,Room 208,Madison,Wisconsin 53718-8812-PH:608/224-3730,FAX:608/224-3745 <br /> www.countyofdane.com/landconservation <br />
The URL can be used to link to this page
Your browser does not support the video tag.