|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-03610
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPREZ-0000-03610
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2016 2:26:57 PM
Creation date
12/7/2016 2:26:55 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
03610
Town
Windsor Township
Section Numbers
31
AccelaLink
DCPREZ-0000-03610
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I , - . <br /> • <br /> CCJ*16ittloCi. 6701 SEYBOLD RD., RM. 220 9 <br /> ,iictratejoi MADISON, WISCONSIN 53719 <br /> ,' tt!�' TELEPHONE 274.3898 144;Alje <br /> 1 ` <br /> Feb. . 3 , 1986 <br /> Land Use Commission <br /> Town of Windsor <br /> Town Hall , 4104 Mueller Rd. <br /> DeForest, Wi. 53532 <br /> Subj : Roske land rezonning <br /> Gentlemen <br /> We have received a request to address the questions presented <br /> in the minutes of the Jan. 21 planning commission meeting <br /> relative to the Roske land located between I 90-94 and Lake Rd. <br /> From the USGS map attached the approximate area draining to <br /> the South North of the entrance road to Kenworth is 49 acres. <br /> The wetland from the same map is approximately 9 acres. I am <br /> sure that the wetland area changes depending upon the yearly <br /> rainfall . There is a 24" corrugated culvert pipe draining the <br /> above land installed under the Kenworth roadway. On 1/31/86 <br /> this pipe was half filled with dirt. The culvert drains to <br /> the South towards STH 19 along the East side of the <br /> interstate and enters a waterway on the southwest side of STH <br /> 19 and I-90 & 94. In addition the Roske land has tile drains <br /> that also drain to the same waterway West of the interstate <br /> highway. A map of the drain field is also included . <br /> Storm Water Runoff- Storm water drains to the culvert located <br /> under Kenworth's roadway. The slope of the land from the <br /> North is very slight. The pipe installed requires cleaning <br /> and to provide sufficient waterway a second culvert should be <br /> installed. I suggest that a 21" culvert be installed adjacent <br /> to the existing 24". The ditch to the South should be cleaned <br /> and some type of settling basin installed on the inlet side of <br /> the culverts. This could be a depressed area that is located <br /> in the present waterway between the Kenworth parcel and the <br /> parcel to the East. <br /> Surface Water Runoff- Present surface water drains from <br /> North to South and West from Lake Rd. to the culvert under <br /> the entrance road. There is a waterway extending from the <br /> culvert to the North of the Kenworth property. This waterway <br /> should be retained. <br /> SURVEY AND DESIGN FOR MUNICIPAL IMPROVEMENTS. WATERWORKS. SEWERS. SEWAGE TREATMENT WORKS. <br /> SWIMMING POOLS AND HIGHWAYS <br />
The URL can be used to link to this page
Your browser does not support the video tag.