Laserfiche WebLink
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if : . r <; <br /> 33' 33' I I <br /> I I <br /> Front Setback area S 72°57'40" E 254.01' r-Side Setback area <br /> • Rear <br /> I JJ�JJ�� Setback <br /> r// ._„.# %/%������� /�� I area <br /> O / O <br /> o / <br /> ✓ 10 Feet t— g <br /> M Needs a W <br /> 4 <br /> ,-- eeee:!eee Location / W <br /> Q I W 7 Yj ' Survey �% �Selback w <br /> OO '�`, . % ' Proposed 169.8' Line 1.0 <br /> N Q Addition : O <br /> _J N 35. % cO <br /> O N 0 <br /> ti _ _ � 00 <br /> � ‘_. <br /> 1 . <br /> • <br /> r <br /> I Side Setback area N 72°57'40” W <br /> I <br /> 33' 33' I I <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner,or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions.I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning&Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property.. <br /> PRINT: Owner/Agent c DATE: <br /> C *c T V€( rz-1=a? <br /> SIGNATURE: Owner/• en <br /> // 4` <br /> Iii <br /> N <br />