|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00897
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00897
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 4:06:10 PM
Creation date
12/12/2016 1:42:00 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00897
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ E <br /> f� .O i <br /> o 'l• � r Land Conservation Division <br /> �# Dane County Land&Water Resources Department <br /> ?'sCOIZS / Patrick J.Sutter,County Conservationist <br /> k <br /> DATE: October 1, 2008 <br /> TO: Mildred Krause <br /> Owner <br /> FROM: Jason Tuggle <br /> Erosion Control Specialist <br /> RE: Krause SFR 3143 Sunnyside—Shoreland Erosion Control Plan, SE2008-0281 <br /> The submitted shoreland erosion control plan meets the needs of the site. The plan includes the <br /> following requirements: <br /> 1. The site may only be accessed off Sunnyside Street using a stone tracking pad. The pad <br /> must be a minimum of 50' long and be constructed of 3-inch clear stone. No other site <br /> access may be used and any material deposited in the road will be cleaned up at the end <br /> of each workday. <br /> 2. Silt fence must be installed prior to grading in the locations shown on the plan and where <br /> deemed necessary, including down slope of all soil stockpiles. The silt fence must be <br /> maintained until the site is vegetated and stabilized. <br /> 3. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur outside the grading limits identified on the plan. In the <br /> event any of these areas are disturbed, additional erosion control measures will be <br /> required. <br /> 4. The plan includes a construction schedule as follows: <br /> Grading and construction is scheduled to begin upon receipt of all required <br /> permits. <br /> Disturbed areas must be temporarily covered with straw mulch by June 1, 2009. <br /> The mulch must be maintained to provide at least 70%coverage until the site is <br /> permanently restored. <br /> All disturbed areas on the site must be permanently seeded and mulched by <br /> October 1, 2009. <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 1 Fen Oak Court,Room 208,Madison,Wisconsin 53718-8812-PH:608/224-3730,FAX:608/224-3745 <br /> www.countyof dane.com/landconservation <br />
The URL can be used to link to this page
Your browser does not support the video tag.