|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00876
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00876
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 3:38:05 PM
Creation date
12/12/2016 3:51:15 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00876
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�..• .xe e'ik <br /> oY r '', Land Conservation Division <br /> Dane County Land&&Water Resources Department <br /> 8'1 sOl Patrick"Sutter,County Conservationist <br /> DATE: October 29, 2008 <br /> TO: Marty Duellman <br /> Owner <br /> FROM: Jason Tuggle \jr- <br /> Erosion Control Specialist <br /> RE: Duellman 342 Lake Shore Drive- Shoreland Erosion Control Plan, SE2008- <br /> 0315 <br /> The submitted shoreland erosion control plan meets the needs of the site and includes the <br /> following requirements: <br /> 1. The site will only be accessed off Lake Shore Drive using a stone tracking pad. The pad <br /> must be a minimum of 50' long and be constructed of 3-inch clear stone. No other site <br /> access may be used and material deposited in the road will be cleaned up at the end of <br /> each workday. <br /> 2. Silt fence must be installed prior to grading in the locations shown on the plan and where <br /> deemed necessary, including down slope of all soil stockpiles. The silt fence must be <br /> maintained until the site is vegetated and stabilized. <br /> 3. Disturbed slopes greater than 20% must be temporarily covered with mulch within 1 <br /> week of initial disturbance. The mulch must be maintained to provide at least 70% cover <br /> until disturbed areas are permanently restored. <br /> 4. This project involves adding fill to areas identified as floodplain, which may require <br /> additional permits. A floodplain filling permit must be obtained from Dane County <br /> Zoning prior to starting the project. <br /> 5. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur in the areas identified as "undisturbed" or"vegetated buffer" <br /> on the plan. In the event any of these areas are disturbed, additional erosion control <br /> measures will be required. <br /> 6. The plan includes a construction schedule as follows: <br /> Grading and construction is scheduled to begin on November 1, 2008. <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 1 Fen Oak Court,Room 208,Madison,Wisconsin 53718-8812-PH:608/224-3730,FAX:608/224-3745 <br /> wwvv.countyofdane.com/landconservation <br />
The URL can be used to link to this page
Your browser does not support the video tag.