Laserfiche WebLink
3 <br /> I <br /> COST ESTIMATE <br /> IThe following table summarizes the estimated cost of completion and installation <br /> of all elements of erosion control for the proposed construction. <br /> I <br /> Item Estimated Unit <br /> No. Description Quantity Unit Price Amount <br /> 1. Stone Construction Entrance 1 EA $500.00 $500.00 <br /> 2. Silt Fence 200 LF $2.00 $400.00 <br /> iii 3. Temporary Mulch 1,000 SY $0.50 $500.00 <br /> il 4. Restoration (Seed & Mulch) 1,000 SY $1.00 $1,000.00 <br /> g <br /> a <br /> 3 Total $2,400.00 <br /> II <br /> , <br /> is <br /> I <br /> dl <br /> lif <br /> 41 <br /> a <br /> ft <br /> a <br /> 11 <br /> iiil <br /> m <br /> 0 <br /> S <br /> ■r Shoreland Erosion Control Report <br /> EB-01-08 <br /> 10/23/2008 3 <br /> do <br />