Laserfiche WebLink
11.02(5)— 11.03(4)(g) <br /> feet from the ordinary high-water mark of 2. If there is an existing primary building on <br /> navigable lakes, ponds or flowages listed in the only one side, the setback for the proposed <br /> "Surface Water Resources of Dane County" building shall be the average of the required (75') <br /> published by the Wisconsin Department of setback and the existing building's setback. <br /> Natural Resources, or so designated on the 3. Other setbacks may be permitted by the <br /> United States Geological Survey Quadrangle board of adjustment as per section 10.26(6)(c). <br /> Maps, or included on other county zoning base .3) Boathouses. (a) Boathouses shall not be <br /> maps, and all lands which are within 300 feet of onstructed below the ordinary high-water mark. <br /> the ordinary high-water mark or landward side of (b) Boathouses shall not be utilized for human <br /> the flood plain of the navigable reaches of rivers habitation. <br /> and streams. Rivers and streams shall be (c) Height of a boathouse shall be measured <br /> presumed to be navigable if they are designated ically from the ordinary high-water mark. <br /> as either continuous or intermittent waterways on ailings may be placed on top of the boathouse <br /> U.S.G.S. Quadrangle Maps or other zoning base rovided the railing is not solid in appearance <br /> maps which have been incorporated by 'nd not greater than 3.5 feet in height. <br /> reference and made a part of the ordinance in (d) The maintenance and repair of non- <br /> section 10.03 of this ordinance. conforming boathouses which are located below <br /> (b) The county zoning administrator shall the ordinary high-water mark of any navigable <br /> make the initial determination of whether or not a waters shall comply with the requirements of <br /> lake, pond flowage, river or stream is navigable. section 30.121 of the Wisconsin Statutes. <br /> (c) The county zoning administrator shall (4) An existing marina fuel system tank may <br /> make the initial determination of the location or be replaced within 75 feet of the high-water mark <br /> elevation of the ordinary high-water mark. if a conditional use permit is approved by the <br /> (d) When the navigability or ordinary high- Zoning and Natural Resources Committee. Prior <br /> water mark is questionable the zoning to issuance of a conditional use permit, the <br /> administrator shall contact the appropriate Zoning and Natural Resources Committee must <br /> department of natural resources office for find that the following conditions are met: <br /> assistance in making the determination. (a) Due to physical limitations of the property, <br /> [History. (1)am.,OA 42,1996-97,pub.06/17/97.] it is not possible to construct a replacement <br /> marina fuel system tank at a compliant setback <br /> 11.03 SHORELAND REGULATIONS. (1) from an ordinary high-water mark; <br /> Building lots: Lots located in shoreland areas (b) Fuel tanks and fuel lines shall be of at <br /> shall meet all area, width, density and lot least double-wall construction; <br /> coverage standards required in section 10.05(4) (c) Monitoring devices shall be installed and <br /> and (5), R-1 residence district, section 10.16(3), maintained to detect any leaks from fuel system <br /> general provisions and exceptions of chapter 10 tanks and lines. Leak monitoring method shall <br /> of the Dane County Code of Ordinances. be state approved electronic interstitial devices <br /> (2) Setback from ordinary high-water mark. installed and maintained to detect any leaks from <br /> (a) Except as provided in sections 11.03(2)(b) fuel system tanks and lines; <br /> and 11.03(4), the setbacks for all buildings and (d) The dispensing of motor fuel into water- <br /> structures, except piers, boat hoists and craft shall be conducted in conformance with the <br /> IMP, shall not be less than seventy-five provisions of Wisconsin Administrative Code <br /> measured horizontally, from an Chapter COMM 10. Retail sale of Class I or II <br /> ordinary high-water mark, unless otherwise liquids shall be limited to self-propelled marine <br /> specified by the county flood plain zoning craft; <br /> ordinance provisions. (e) Fuel dispensing systems for watercraft <br /> (b) Reduced setback. Proposed primary shall have automatic nozzles with non-drip <br /> buildings which will be located within 200 feet of provisions; <br /> existing primary building(s), which have a (f) Replacement marina fuel system tanks <br /> setback of less than 75 feet, may have a reduced shall not be located less than thirty five (35) feet, <br /> setback as follows: measured horizontally, from an ordinary high- <br /> 1. Where there is a primary building on each water mark; <br /> side of the proposed site, the setback for the (g) Vegetative screening, using species native <br /> proposed building shall be the average of the to South Central Wisconsin, shall be placed so <br /> setbacks of the existing buildings. as to shield tanks and containment structures <br /> from view from the adjacent water body. <br /> Page 11-3 <br /> rev 013107 <br />