|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00871
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2016 3:39:56 PM
Creation date
12/16/2016 4:08:36 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00871
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I Erosion Control «°°r useo;►ry <br /> Application Checklist Perm'tiVunitier• <br /> ill <br /> Y <br /> Project Name: 395 Lake Shore Drive House Reconstruction <br /> Please check the appropriate box: l=Included; NA=Not Applicable (if'NA'is checked,an explanation must be provided) <br /> Applicant LCD <br /> Plan Requirement I NA Location in Plan -page number I NA <br /> 1. Detailed written description of how the site will be developed See Checklist Comments <br /> (narrative including scope of land disturbing activities and sequence of <br /> diconstruction events) <br /> 2. Plan drawing of site(of known scale and including:property lines,lot See Exhibit#3 <br /> 1 dimensions,limits of disturbed area, limits of impervious area,land cover <br /> r> type,natural and artificial water features, 100-yr flood plain,delineated �/ <br /> wetland boundaries,location of all proposed erosion control practices) <br /> til 3. Direction of runoff flow(elevation contour lines or runoff arrows) / ` See Checklist Comments <br /> 4. Watershed size for each drainage area (include all off site run-on and / 'See Checklist Comments <br /> area within the project boundaries) b S'•1:7- -;' <br /> IN 5, Provisions to prevent mud-tracking onto public thoroughfares See Checklist Comments <br /> 1( kti <br /> during construction(i.e.tracking pad or existing gravel drive) <br /> 6 Provisions to prevent the delivery of sediment to btormwater t'See Checklist Comments <br /> conveyance system(i.e.inlet protection or stone weeper) <br /> 4 <br /> di 7. Prevent gully and bank erosion and apply minimum standards „See Exhibit#4 <br /> for sheet and rill erosion: 7.5 tons/acres/year(Universal Soil Loss / r` <br /> Equation-USLE worksheets must be completed and attached) <br /> z- 8. Provisions for sequential steps mitigating the erosive effect of See Checklist Comments <br /> 14 II land disturbing activities(list of erosion control practices) <br /> g. Proposed schedule for installation and completion of all See Checklist Comments <br /> OP <br /> elements of the erosion control plan(date(s)must be consistent with ✓ <br /> Av.a USLE and be appropriate for each practice) <br /> 10. Fertilizer and seeding rates(seed,mulch,polymer,fertilizer,etc.) ✓ ,;€ See Checklist Comments <br /> 11. Itemized estimated cost of all elements of the erosion control See Page 3. <br /> plan including installation and labor(a letter of credit[LOC]is <br /> required if estimated cost is greater than$5000) ` <br /> 12. Design discharge for ditches and structural measures(flow i See Checklist Comments <br /> di calculations) <br /> 13. Cross sections and profiles of road ditches and channels(existing / See Checklist Comments <br /> r <br /> and proposed) �/ <br /> i 14. Runoff velocities in channels(to ensure channel stability) I See Checklist Comments <br /> 15. Culvert sizes(existing and proposed) i See Checklist Comments <br /> a 16. Proof of stable outlet,capable of carrying the design flow at a See Checklist Comments <br /> non-erosive velocity(having no ditches,swales,culverts,downspouts,or <br /> other features that concentrate runoff present and having all runoff leave the <br /> site as sheet flow,may be sufficient to satisfy this requirement) <br /> Li?iiii 17. Copy of Preliminary Review Letter, permits or approvals by other / See Checklist Comments <br /> agencies(e.g.WDNR,Army Corps of Engineers,driveway permit,etc) <br /> 2 18. Any other information necessary to reasonably determine the See Checklist Comments <br /> location,nature and condition of any physical or environmental ✓ <br /> features of the site <br /> IP Any proposed changes to the erosion control plan must be submitted and approved prior to implementation. <br /> iiis <br /> Indicates information must always be included <br /> fr <br /> Revised January 1,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.