|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00871
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2016 3:39:56 PM
Creation date
12/16/2016 4:08:36 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00871
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A-Ab- °P-4.1‘1, DANE_ COUNTY <br /> -"tir <br /> sf�o' ;� -; �'�i, <br /> PLANNING <br /> ,.� DEVELOPMENT <br /> il`,Tt9e , �y Room 116, City-County Building, Madison, Wisconsin 53703 <br /> 'iii a sue' Fax (608) 267-1540 <br /> ��k��cor►s <br /> Housing& <br /> Economic Development <br /> (608)266-4270,Rm.362 <br /> November 11, 2008 <br /> Planning <br /> (608)266-4251,Rm. 116 <br /> Nellie Jaskewycz <br /> 3846 N Bernard Records &Support <br /> Chicago, WI 60618-1853 (608)266-4251,Rm. 116 <br /> Zoning <br /> (608)266-4266,Rm.116 <br /> Flood Plain Filling Permit 533-C <br /> Placing fill around the residential structure at 395 Lake Shore Drive, Town of Albion, for Floodplain <br /> Compliance <br /> 1 <br /> Dear Nellie Jaskewycz, <br /> Dane County Zoning Division has reviewed the information prepared by Quam Engineering with regards to placing <br /> fill in the Flood Fringe area. The engineering has been found to conform to Dane County Code of Ordinance, <br /> . - Floodplain Regulations. The filling and the grading shall comply with the submitted plan dated October <br /> 23, 2008. <br /> Fill shall be placed to the elevation of 785.2 feet ASL from the edge of the residential structure to a point at least 15 <br /> feet away from the structure wherever practical. <br /> When the project is completed, your engineer will be required to submit an "as built" survey of the property within <br /> 30 days of the completion date designating: <br /> ❑ First Floor elevation of the residential building <br /> ❑ Elevation of the fill that is located 15 feet around the residential structure. <br /> Land disturbance shall not occur until a Shoreland Erosion Control Permit is issued by Dane County Land <br /> Conservation. You can contact them at(608) 224-3730. <br /> NOTE: This approval is only for the purpose of elevating the existing house in conjunction with a zoning <br /> permit. If you choose to remove the existing house and replace the building with a home of different <br /> dimensions, ADDITIONAL APPROVALS are needed. Please contact Dane County Zoning Department prior <br /> to the filling to obtain a zoning permit for your project. <br /> Your cooperation is appreciated in this matter. <br /> Respectfully, <br /> Scott Schroeckenthaler <br /> Dane County Zoning Inspector <br /> By Roger Lane <br /> Dane County Zoning Administrator <br /> CC:DNR Floodplain Management Department <br /> Dane County Land Conservation <br /> Town of Albion Clerk <br /> Quam Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.