|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02367
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2016 3:01:23 PM
Creation date
12/21/2016 8:20:53 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02367
Town
Albion Township
Section Numbers
27
AccelaLink
DCPCUP-2016-02367
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Endpoint Solutions <br /> CUP APPLICATION <br /> Mr.Jon Halverson is requesting this CUP to operate a temporary and portable RMC batch plant for <br /> projects awarded on the Wisconsin Department of Transportation(WDOT) Interstate-39/90 (1- <br /> 39/90) Expansion Project and related County and municipal sponsored projects.The WDOT is in <br /> the process of updating and expanding the I-39/90 Corridor from the Illinois/Wisconsin State line <br /> to Madison,Wisconsin through 2022.The I-39/90 Expansion Project will also generate work at the <br /> County and municipal level as ramps,cross roads,and other County and municipal infrastructure <br /> requires modification or improvements to accommodate the WDOT work.RMC is the primary <br /> construction material used for pavement,supports,driveways,ramps,and other portions of the <br /> State,County,and municipal projects.This has created demand for a locally available and <br /> economical option for the production and distribution of RMC to ensure on-time and on-budget <br /> completion of the project thereby reducing costs to tax payers and impacts on commuters.The 1- <br /> 39/90 Expansion Project and related County and municipal work is expected to be ongoing from <br /> January 1,2017 to December 31, 2022. <br /> SITING/ZONING <br /> The next segment of construction on the 1-39/90 Expansion Project will be near the Rock River <br /> Bridge in Edgerton,Wisconsin.The proposed location on Haugen Road is 3.5 miles away along I- <br /> 39/90 and 5 miles away along Hwy 51 and Hwy 59.Based upon the proximity to the proposed <br /> construction work,accessibility to truck traffic,and generally consistent commercial land use of the <br /> surrounding parcels,the Site offers an ideal location for the staging of a portable RMC batch plant to <br /> support the I-39/90 Expansion Project and associated County and municipal updates. <br /> The Site is zoned C-2 Commercial District and is currently leased and utilized as cropland.The <br /> parcel is 5.2 acres in size with approximately 365 feet of frontage on Haugen Road on the north side <br /> of the parcel.An RMC batch plant is not a conditional use for the C-2 zoning district so Mr. <br /> Halverson is also requesting a zoning change to A-2 Agricultural District under separate cover. RMC <br /> batch plants are a conditional use in the A-2 District. <br /> The proposed operative area at the parcel was identified so as to meet the proper front,side,and <br /> rear setback requirements as identified in Dane County Zoning Regulations for the proposed A-2 <br /> Agricultural District zoning.No building or accessory structure is proposed as part of the <br /> application.The mechanical equipment will have hoppers with a total height of 50 feet above grade <br /> to allow gravity filling of trucks.The batch plant will be portable in order to be located adjacent to <br /> where aggregate storage is occurring at the Site.The proposed area of operation for the portable <br /> plant as well as the existing setback requirements,potential storage areas,and driveway are shown <br /> on Figure 1.The land use of neighboring parcels along with their zoning is illustrated on Figure 2. <br /> OPERATIONS PLAN <br /> The proposed temporary and portable installation of an RMC Batch Plant would be utilized to mix <br /> concrete and load concrete trucks to supply I-39/90 Corridor Expansion Project jobsites and <br /> related County and municipal projects required due to the corridor expansion.While the exact <br /> number of employees will depend on the size and timing of the job awarded,similar plants staff <br /> RMC Batch Plant Conditional Use Permit Amendment-Mr.Jon Halverson November 14,2016 <br /> Endpoint Project:393-002-001 Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.