Laserfiche WebLink
must reach me within two(2)weeks of the date of this letter or a citation will be issued for each day of non- <br /> compliance. <br /> Continuation of work without submitting a location survey has constituted a violation of the zoning permit <br /> conditions and of the Dane County Code of Ordinances, Chapter 10.25 (see below), and may result in further <br /> enforcement actions. <br /> 10.01(30m)Location survey, as indicated in this ordinance, refers to survey information prepared by a licensed surveyor <br /> indicating the location of property lines and building location distances from those property lines for the specific portions of the <br /> building indicated in this ordinance. Such surveys are not required to provide all the parcel information set forth by Wisconsin <br /> Administrative Code Chapter A-E 7.02 Minimum Standards for Property Surveys item A-E 7.01(2)but may exclude unnecessary <br /> information as permitted in A-E 7.01(2)and provide only the information required by the zoning ordinance but such information <br /> must comply with the accuracy standard required by A-E 7.06 Measurements. <br /> 10.25(3)(a)1.A location survey as defined herein shall be submitted to the zoning division for all construction, which will be <br /> located less than 10'from required setback lines. The survey shall be done at the time when foundations or basement walls <br /> are completed, or when slab is poured. Such survey shall be submitted to the zoning office prior to the continuation of work <br /> on the project. <br /> Thank you for your cooperation, and I look forward to receiving the location survey. <br /> Sincerely, <br /> Russell L. Bartlett,bartlett@countyofdane.com, 608-267-3960,Zoning Inspector, County of Dane <br /> Enclosures: Copy DCPZP-2015-00403 <br /> ***NOTICE TO APPLICANT*** <br /> Return envelope <br /> Aaron.kostichka @mcgannconstruction.com <br />