|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00799
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00799
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 1:19:54 PM
Creation date
1/13/2017 2:48:35 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00799
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
40 Ito <br /> U; { Dane Co :_ Planning and Development Department <br /> f Room 116,City-County Building,Madison,Wisconsin 53703 <br /> 1' Fax (608)267-1540 Community Development <br /> 4t01006 (608)261-9781,x.421 I <br /> z <br /> Planning 1 <br /> (608)266-4251,Rm.116 1 <br /> July 200 � <br /> Records&Support <br /> (608)266-4251,Rm.116 <br /> j ' <br /> Zoning 1 t <br /> ZONING PERMIT INSPECTION REQUIREMENTS (608)2664266,Rm. 116 <br /> The Dane County Zoning Ordinance provides that two inspections shall be made by the Zoning <br /> Department. Instructions are as follows: I <br /> 1. The permit card shall be posted on the premises before any earth disturbing activity is started. j <br /> 1 <br /> i <br /> 2. The owner or his agent shall have all lot corners visibly staked prior to requesting an 1 <br /> inspection. The Zoning Inspector shall not be responsible for determining the location of lot <br /> lines. Please be advised that zoning inspections are made in reliance upon your correct <br /> 6,..7t 1 <br /> identification of property boundaries and lot lines. 0 <br /> (hill <br /> di) FIRST INSPECTION: 6 �` <br /> l \ 'p n I <br /> 0, Is a location survey required?0/No If yes, a first inspection phone call request <br /> is not required. <br /> 14, <br /> b. The owner or his agent shall request the first inspection when the foundation or 1 <br /> basement walls have been constructed. Footings only are not c•• -ref . 1 <br /> foundation. i' <br /> 4. SECOND INSPECTION: Shall be requested when the building 's substantially completed. <br /> Interior trim, carpeting, painting, etc., do not have to be finished a or to the inspection :•t, ii , <br /> interior walls must be in place and the electrical, plumbing and h- .' - &a -- ust be 1';7 <br /> installed and operating. <br /> 1 <br /> 5. CERTIFICATE OF COMPLIANCE: The zoning inspections are made to verify <br /> compliance with the regulations of the zoning ordinance. The Zoning Division upon 1 <br /> completion of the second inspection will issue a certificate of compliance. <br /> k <br /> r <br /> T. •-• 1 - • '• •- a',. .. 66-426. a onda throu. rida 7:45 AM - 4:30 PM. lease 1 <br /> give the permit number9490-i 07 9 ciand the town that it is located in. You will be given an <br /> inspection request number,which will serve as a verification of your call. S <br /> IMPORTANT: The two inspections required by the Zoning Ordinance can only be made by the i,, <br /> Zoning Department. <br /> is <br /> ** TOWN PERMITS: For information regarding Town permits, contact <br /> anew-1z-i_/ !4 c- at a s S - ya) cI --4-..1Q1 / . <br /> S:\PIanDev\Zoning'ZLR\Forms,Applications&Informational Materials\ZONING PERMIT INSPECTION RQMTS.DOC <br /> I <br /> 1. <br /> f' <br />
The URL can be used to link to this page
Your browser does not support the video tag.