|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00007
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 1:16:00 PM
Creation date
1/19/2017 3:19:15 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/1/2016 <br /> CLEARY JAY GU N CRAVEN,ANDREW <br /> Cell Phone:ne: (60(608) 212-2129 Doc ID:3883820161101093259 <br /> BUILDING CORP. Phone Number:(608)845-9700 Client Proposal - Erected <br /> Clearyeuiiding.com Email:JGunders @clearybuilding.com <br /> Branch Email:verona @clearybuilding.com <br /> None on El &E2 <br /> Accessories <br /> (1)Overhead frame out. Size: 12'0"Width x 12'0" Height <br /> Headroom Available:2' 3" <br /> OVERHEAD DOOR NOT INCLUDED UNLESS OTHERWISE NOTED IN WRITING IN THE ADDITIONAL <br /> BUILDING COMPONENTS SECTION. <br /> (1)Overhead frame out. Size: 12'0"Width x 12'0" Height <br /> Headroom Available:2'3" <br /> OVERHEAD DOOR NOT INCLUDED UNLESS OTHERWISE NOTED IN WRITING IN THE ADDITIONAL <br /> BUILDING COMPONENTS SECTION. <br /> (1)2'SOLAR continuous eavelites (CLEAR) <br /> (1)2' SOLAR continuous eavelites (CLEAR) <br /> (1)Plyco Series 20 Standard 3'-0"x6'-8"with 2x6 frame <br /> Features: No Embossment, No Closer, No Deadbolt, EZ-KNOB/KNOB ORBIT ENTRY GRADE 2(STAINLESS STEEL), <br /> No Latch Guard, No Panic Hardware, No Kick Plate, No Chain <br /> Keyed alike key group number: 1 <br /> Interior Finish/Insulation <br /> Condensation Control: None <br /> Wall Insulation: None <br /> Interior Nailers: None <br /> Interior Liner: None <br /> '40111) <br /> Notes <br /> South Endwall is open with interior endwall placed at the first bay to the north of the open end <br /> Raise treated 2"x 8"to 100+8"at the east al d westi�dewall oft first 10' bay to the south ' <br /> 4 north endwall columns and 2 columns on the easfwall next toe north end.6 total 2' longer columns <br /> Additional Building Components <br /> Excavating/Site Prep <br /> $7229 Allowance to include: <br /> Stripping the top soil and stock pile for use at building perimeter <br /> Install and compact 513 ton of fill material($8/ton) <br /> Install and compact 100 ton of 3/4"gravel (9.21/ton) <br /> Excavating to level site and install fill materials <br /> Overhead Doors <br /> 12 x12 Haas model#224 ohd's no operators <br /> t-handle lock on north door <br /> Gutter <br /> 5" Gutters both Eaves with 1 downspout at each corner on North end <br /> Project Investment <br /> v6/11 built with pride before the is applied U 2 of 3 <br /> e <br />
The URL can be used to link to this page
Your browser does not support the video tag.