|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-03636
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPREZ-0000-03636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 12:17:07 PM
Creation date
1/24/2017 12:17:05 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
03636
Town
Deerfield Township
Section Numbers
10
AccelaLink
DCPREZ-0000-03636
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Payne & Dolan, Inc. <br /> Post Office Box 781 <br /> N3 W23650 Badinger Road 5338 Norway Grove School Rd. <br /> Waukesha,Wisconsin 53187 DeForest,Wisconsin 53532 <br /> February 26, 1986 <br /> Zoning Department <br /> County of Dane <br /> 210 Monona Avenue <br /> Madison, Wisconsin 53709 <br /> Payne & Dolan, Inc. , as agents for the owners of the property described <br /> on the accompanying page, hereby make a petition to re-zone land (A-1 exclusive <br /> to A-2) and apply for a conditional use and mineral extraction permits relating <br /> to the same property. <br /> C tuNex: QcBPKT o! e)ke:1-./L sp6At s <br /> 1) Tax #12-10-217, 12-10-219, 12-10-222 <br /> 2) Acreage = 41 acres. <br /> 3) Current use the property is presently used as pasture and cropland <br /> 4) The property is bordered by farmland <br /> 5) Proposed use and development schedule: <br /> Payne & Dolan, Inc. has entered into a contract with Wisconsin <br /> Department of Transportation to resurface STH 73 from the north <br /> village limits of Deerfield to I-94, including improving the inter- <br /> section of STH 73 & CTH BB. Payne & Dolan, Inc. has entered into <br /> an agreement with the owners of this property to remove sand and <br /> gravel to be used as base course and as bituminous concrete. It is <br /> anticipated that sand and gravel removal will begin in May 1986, <br /> stockpiles will be produced. A portable asphalt plant will be <br /> moved onto the site in June 1986 to produce the bituminous concrete. <br /> It is anticipated that paving will be complete by late June 1986. <br /> At that time, the asphalt plant will be removed, the sand and <br /> gravel extraction area will be reclaimed. Access will be via a <br /> driveway installed on Missouri Road. <br /> No water is required for any of the operations proposed. <br /> No permit buildings or structures will be erected. <br /> Sand and gravel was discovered while doing test borings on <br /> • the property. <br /> Sincerely, <br /> WILLIAM G. BUGLASS <br /> PAYNE & DOLAN, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.