|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00754
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00754
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 1:25:54 PM
Creation date
1/24/2017 3:14:41 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00754
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
41 ALLIANT <br /> ENERGY. <br /> To: Steve Kelliher September 15,2008 i <br /> Clack Corporation 1 <br /> 4462 Duraform Lane <br /> Windsor,WI. 53598 <br /> Steve, 4 <br /> If, <br /> This letter will serve as your confirmation to proceed with installation of a new sign that will be installed at <br /> your metering cabinet(PME-9)provided you comply with the following: ' <br /> 1. The bottom of the sign should be no lower that 6' above the asphalt level. <br /> 2. The width of the sign posts are at least 6'apart and do not impact the opening of the PME-9 doors. <br /> And lastly,thanks for contacting us before hand rather than later in the process. <br /> \Good luck with your project! <br /> S' cerreeellyy,,, <br /> Joe DiMaggio <br /> Sr. Strategic Accou Manager i <br /> Alliant Energy <br /> M <br /> 7 <br /> t <br /> t <br /> } <br /> I <br /> il <br /> 1} <br /> !I <br /> I <br /> 4 <br /> it <br />
The URL can be used to link to this page
Your browser does not support the video tag.