Laserfiche WebLink
41 ALLIANT <br /> ENERGY. <br /> To: Steve Kelliher September 15,2008 i <br /> Clack Corporation 1 <br /> 4462 Duraform Lane <br /> Windsor,WI. 53598 <br /> Steve, 4 <br /> If, <br /> This letter will serve as your confirmation to proceed with installation of a new sign that will be installed at <br /> your metering cabinet(PME-9)provided you comply with the following: ' <br /> 1. The bottom of the sign should be no lower that 6' above the asphalt level. <br /> 2. The width of the sign posts are at least 6'apart and do not impact the opening of the PME-9 doors. <br /> And lastly,thanks for contacting us before hand rather than later in the process. <br /> \Good luck with your project! <br /> S' cerreeellyy,,, <br /> Joe DiMaggio <br /> Sr. Strategic Accou Manager i <br /> Alliant Energy <br /> M <br /> 7 <br /> t <br /> t <br /> } <br /> I <br /> il <br /> 1} <br /> !I <br /> I <br /> 4 <br /> it <br />