|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02370
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02370
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 10:42:15 AM
Creation date
1/30/2017 10:42:09 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02370
Town
Blooming Grove Township
Section Numbers
16
AccelaLink
DCPCUP-2016-02370
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FIRE PROTECTION REMODELING <br /> The existing fire sprinkler piping and sprinkler heads affected by the removal of existing walls and <br /> ceiling revisions will be revised to include new mains and branch piping and new sprinkler heads to <br /> accommodate the new floor plan layout and new ceilings. <br /> The sprinkler density requirements for the book stack areas will be revised from a light hazard <br /> classification to ordinary group 2 hazard occupancy classification. <br /> ESTIMATE OF PROBABLE PLUMBING CONSTRUCTION COST <br /> Estimate of probable plumbing demolition cost: $7,500 <br /> Estimate of probable plumbing remodeling cost: $13.500 <br /> Total probable plumbing remodeling cost: $21,000 <br /> ESTIMATE OF PROBABLE FIRE PROTECTION COST <br /> Total probable fire protection remodeling cost: $9,000 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.