Laserfiche WebLink
1. Wisconsin Division WISCONSIN UNIFORM BUILDING Application No. <br /> o€Safety and Buildings PERMIT APPLICATION QZ Wisconsin Stats. 101.63, 101.73 Instructions on back of second ply.The information you provide may be Parcel No. <br /> used by other government agency programs[(Privacy Law,s. 15.04(1)(m)] <br /> �Lc �g�_ . 2 <br /> e �; <br /> PERMIT REQUESTEDonstr. ❑ HVAC ❑ Electric ❑ Plumbing osion Control Other: <br /> Mm $ _ Tel <br /> lO0P 'AIU J I) /-7 l (U 1/ Lf0U/C L OSYCiOf <br /> Contractor's <br /> Name: ❑Con ❑Elec ❑HVAC ❑Plbg LSc/Cert# Mailing Address Tel. <br /> E - ? , 80,\-- /0 (. -7mi,66 ‘,/,,,ye# <br /> Contractor's Name: ❑Con ❑Elec ❑HVAC ❑Plbg Lic/Cert# Mailing Address Tel. <br /> FAX# <br /> Contractor's Name: ❑Con ❑Elec ❑HVAC ❑Plbg Lic/Cert# Mailing Address Tel. <br /> FAX# <br /> Contractor's Name: ❑Con ❑Elec ❑HVAC ❑Plbg Lic/Cert# Mailing Address Tel. <br /> FAX# <br /> PROJECT Lot area <br /> LOCATION Sq.ft. //tAI 1/4, /U.L4-1/4, of Section a p,T 7 N,R 0\E(or)W <br /> BG 1 p7dds/t ��H� 4 P Subdivision�N/14 /. Lot No. Block Nom <br /> Zoning District(s) yyrr Zoning Permit Nof.// "( Setbacks: Front Rear p( Left Right <br /> /Fr 3 `f ' /O`1' 6 Zo( ft. /Z ft. 1,72 ft. /7 ft. <br /> 1.PROJECT 3:OCCUPANCY 6.ELECTRICAL 9:HVAC EQUIPMENT 12.ENERGY SOURCE <br /> ANew ❑Repair 6-frtgle Family Entrance Panel ❑Forced Air Furnace Fuel Nat Gas LP Oil Elec Solid Solar <br /> ❑Alteration ❑Raze d Two Family Amps: ❑Radiant Basebd/Panel Space Htg <br /> ❑Addition ❑Move ❑Garage ❑Underground ❑Heat Pump Water Htg <br /> ❑Other. ❑Other. ❑Overhead ❑Boiler ❑Dwelling unit has 3 kilowatt or more in electric space <br /> 7.FOUNDATION ❑Central Air Cond. heating equipment capacity. <br /> 2.AREA INVOLVED 14.CONST.TYPE ❑Concrete ❑Other: 13.HEAT LOSS <br /> Unfin. ❑Site-Built ❑Masonry <br /> Bsmt Sq Ft ❑Mfd: ❑WI UDC ❑Treated Wood 10.SEWER BTU/HR Total Calculated <br /> Living ❑U.S.HUD ❑Other: ❑Municipal __ Envelope and Infiltration Losses("Maximum Allowable <br /> Area Sq Ft 5.STORIES 8.USE ❑Sanitary Permit No Heating Equipment Output"on Energy Worksheet; <br /> ❑ 1-Story ❑Seasonal "Total Building Heating Load"on WlScheck report) <br /> Garage Sq Ft ❑2-Story ❑Permanent 11.WATER 14.EST.`BUILDING COST <br /> ❑Other. ❑Other: ❑Municipal Utility <br /> Deck Sq Ft. ❑Plus Basement ❑Private On-Site Well $ <br /> I agree to comply with all applicable codes,statutes and ordinances and with the conditions of this permit;understand that the issuance of the permit creates no legal liability, <br /> express or implied,on the state or municipality;and certify that all the above information is accurate. If I am an owner applying for an erosion control or construction permit, <br /> I have read the cautionary statement regarding contractor financial respo s ibility on the reverse side of the last ply.I expressly grant the building inspector,or the inspector's <br /> authorized agent,permission to enter the premi es for which this permii)ought at all reasonable hours and for any proper purpose to inspect the wor which is being do <br /> APPLICANT'S SIGNATURE ��tl% r �e . DATE SIGNED/—/Z <br /> APPROVAL CONDITIONS This pe .0 's-issued pursuant to the following conditions. Failure to comply may result in suspension or revocation of this <br /> permit or other penalty. ❑ See attached for conditions of approval. <br /> ISSUING 'own of ❑Village of ❑City of ❑County of ❑State Inspection Agency#: Municipality Number of Dwelling Location <br /> JURISDICTION !Y i �V/IIt)I - <br /> FEES: /f PERMIT(S)ISSUED WIS PERMIT SEAL# PERMIT'ISSUED-HY: <br /> Plan Review $ ❑ Construction �� <br /> Inspection $ ❑HVAC N.a.. //�.r <br /> Wis.Permit Seal $ ❑Electrical <br /> Other $ ❑Plumbing Date,////CV Tel. <br /> osion Control ` <br /> Total $ //0 Cert No. �.-e97d7 <br /> SBD-5823 (R.4/02) Distribution: ❑Ply 1-Issuing Jurisdiction ❑Ply 2-Municipality Forwards to State If New Dwelling ❑Ply 3-Inspector ❑Ply 4-Applicant <br /> ISSUING JURISDICTION <br />