Laserfiche WebLink
Erosion Control LCD office use onty <br /> Application Checklist Permit Number. <br /> Date: <br /> Project Name: 78 Oak Street Drive House Reconstruction <br /> Please check the appropriate box: l=Included; NA=Not Applicable(if'NA'is checked,an explanation must be provided) <br /> Applicant LCD <br /> Plan Requirement I NA Location in Plan-page number I NA <br /> 1, Detailed written description of how the site will be developed See Checklist Comments <br /> (narrative including scope of land disturbing activities and sequence of ✓ <br /> construction events) <br /> 2. Plan drawing of site(of known scale and including:property lines,lot See Exhibit#3 <br /> dimensions,limits of disturbed area,limits of impervious area,land cover / <br /> type,natural and artificial water features, 100-yr flood plain,delineated v <br /> wetland boundaries,location of all proposed erosion control practices) <br /> 3. Direction of runoff flow(elevation contour lines or runoff arrows) t/ See Checklist Comments <br /> 4. Watershed size for each drainage area(include all off site run-on and i See Checklist Comments <br /> area within the project boundaries) <br /> 5, Provisions to prevent mud-tracking onto public thoroughfares i See Checklist Comments <br /> during construction(i.e.tracking pad or existing gravel drive) <br /> 6 Provisions to prevent the delivery of sediment to stormwater i See Checklist Comments <br /> conveyance system(i.e.inlet protection or stone weeper) ) <br /> 7. Prevent gully and bank erosion and apply minimum standards See Exhibit#4 <br /> for sheet and rill erosion:7.5 tons/acres/year(Universal Soil Loss i <br /> Equation-USLE worksheets must be completed and attached) <br /> 8. Provisions for sequential steps mitigating the erosive effect of i [ #} See Checklist Comments <br /> land disturbing activities(list of erosion control practices) x_t <br /> g. Proposed schedule for installation and completion of all k ` See Checklist Comments 1i <br /> elements of the erosion control plan(date(s)must be consistent with t/ 1 <br /> USLE and be appropriate for each practice) <br /> Fxn, <br /> 10. Fertilizer and seeding rates(seed,mulch,polymer,fertilizer,etc.) ✓ See Checklist Comments <br /> 11. Itemized estimated cost of all elements of the erosion control .,See Page 3. <br /> plan including installation and labor(a letter of credit[LOC]is <br /> required if estimated cost is greater than$5000) <br /> MI 12. Design discharge for ditches and structural measures(flow / See Checklist Comments <br /> ii calculations) <br /> 13. Cross sections and profiles of road ditches and channels(existing / See Checklist Comments <br /> and proposed) v <br /> 14. Runoff velocities in channels(to ensure channel stability) ✓ See Checklist Comments <br /> 15. Culvert sizes(existing and proposed) I See Checklist Comments <br /> 3 16. Proof of stable outlet,capable of carrying the design flow at a lk:rr See Checklist Comments <br /> non-erosive velocity(having no ditches,swales,culverts,downspouts,or / & <br /> other features that concentrate runoff present and having all runoff leave the �I -�-: <br /> site as sheet flow,may be sufficient to satisfy this requirement) ivy9 <br /> 3 17. Copy of Preliminary Review Letter,permits or approvals by other / See Checklist Comments <br /> agencies(e.g.WDNR,Army Corps of Engineers,driveway permit,etc) <br /> 18. Any other information necessary to reasonably determine the See Checklist Comments <br /> location,nature and condition of any physical or environmental ✓ <br /> features of the site <br /> *Any proposed changes to the erosion control plan must be submitted and approved prior to implementation. <br /> t l Indicates information must always be included <br /> Revised January 1,2007 <br />