|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-03744
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPREZ-0000-03744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2017 9:40:48 AM
Creation date
2/2/2017 9:40:47 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
03744
Town
Springfield Township
Section Numbers
5
AccelaLink
DCPREZ-0000-03744
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A <br /> • <br /> Michels Pipe Line Construction Inc. <br /> 817 Main Street <br /> P.O. Box 128 <br /> Brownsville, WI 53006 <br /> July 8, 1986 <br /> County of Dane <br /> Zoning Department <br /> City-County Building <br /> Madison, WI 53709 <br /> Michels Pipe Line Construction, Inc. as agents for the owners of the <br /> property described as the East 1/2, of the SW 1/4, of Sec 5, T.8N.-R,8E <br /> (Town of Springfield) in Dane County, hereby petition to rezone land from <br /> A-1 exclusive to A-2, and apply for a conditional use and mineral extract- <br /> ion permits relating to the same property. <br /> 1. Owner - Thomas & Helen Pertzborn <br /> 2. Tax parcel # <br /> 3. Acreage = 80 acres <br /> 4. Current use - pasture and cropland <br /> 5. The property is bordered by farmland. <br /> 6. Proposed use: Michaels Pipe Line is a subcontractor to Payne <br /> and Dolan, Inc. on the Wisconsin Department of Transportation <br /> CTH P project. The resurfacing of CTH P (from Cross Plains to <br /> HWY 12) is scheduled for September, 1986. Michels Pipe Line <br /> desires to remove and crush sand and gravel from the property <br /> to be used in the bituminous concrete mixture for this job. Michels <br /> also plans to have Payne & Dolan erect their portable asphalt plant <br /> on this parcel for the CTH P job only. No water is required, no <br /> permanent building will be erected, and no new access will be <br /> required. <br /> Yours truly, <br /> Otto Ramthun, Div. Mgr <br /> Michels Pipe Line Construction, Inc. <br /> OR/tb <br />
The URL can be used to link to this page
Your browser does not support the video tag.